•Checkthatthedeclarationofsuitability/adequacyofthesupport/fixingstructuresispresent;
•Checkthatobviousdefectsofthesupport/fixingstructuresareabsent(fig.17);
•Checkthesuitabilityofthemanoeuvrespaces(rotation)availableforthejibcrane,especiallyifitoperatesinareas
where there are other cranes or other manufacturing machines (fig.18);
•Checkthesuitabilityandcorrectfunctioningoftheelectricsystem(fig.19):
1) correspondence of the power line voltage with the voltage for the motors;
2) that there is a suitable switch/disconnecting switch for the power line;
3) adequacy of the section of the cable of the electrical power supply;
4) that there is a suitable earthing system;
•Inthecaseofajibcranewithanarmwithasectionbaroflaminatedgirder(H-orT-type),checkthewidthofthe
flange of the girder which must correspond to that intended for the trolley wheels (fig. 20).
•Preparetheloadsforthe
test runs
equal to:
nominal lifting capacity x 1,1
•Preparetheloadsforthe
static test runs
equal to:
nominal lifting capacity x 1,25
•Preparetheequipmentfortheslingingandliftingoftheloadsfortheloadtestruns
•Checkthattherearetherelevantsignstowarnoftherisksposedbythemanoeuvringofthecrane.
4.3.2 Preparing the place of installation
Toallowtheinstallationofthejibcrane,thefollowingoperationsmustbecarriedout: