26
INSTRUCTIONS JIB CRANE SERIES GBA - GBP
MAN05MGO5
4.3.4 Assembly of the bracket – For GBP wall-mounted cranes
Assemblyofthebracketstothepillarorload-bearingwall:
Assemblyofthebracket:
•Thefixingofthebrackettothesupportstructurecantakeplaceasfollows:
•usingbracketswiththerelatedstaybolts.
•usingboltsandscrewanchorsordowelling.
•Thefixingofthebracketusingboltsandscrewanchorsordowelling,requiresascrupulouscheckof
suitabilityinrelationtothetypeofsupport.
• Technical data, so that the user can scale the fixings to the right size are shown in the table at
paragraph 2.2.7
(“Fixing systems”-page 12).
•Thesuitabilitychecksofthesupportstructurearetheresponsibilityoftheuserandmustbecarried
outbyexperttechnicianswhoevaluatethefeasibilityandtakeontherelatedresponsibilities.
1. Screw up the nuts
1
on the four staybolts
T
and insert the contrast panels
2
(fig. 31).
2. Assemble the two brackets, the front one
3
and the back one
4,
for the fixing of the upper part of the bracket, in
such a position to obtain the required height under the arm of the crane, inserting the safety washers
5
and the
cramping nuts
6
on the staybolts
T
(fig. 32).
3. Pretighten the nuts
6
to ensure good adherence to the pillar brackets (fig. 33).
1. Assemble on bracket
1
the other front bracket
2
(fig. 34).
2. Lift the bracket to a height with suitable equipment, by putting it in the sling as shown and fix it to the front
bracket previously positioned on the pillar (fig. 35).
3. Assemble on the front bracket fixed on the bracket, the other back bracket (fig. 36). (Refer to the preceding point
“Assembly of the brackets” at positions 1 and 2)
fig.34
fig.35
fig.36
fig.31
fig.32
fig.33
2
T
5
6
2
1
6
4
3
5
6
1
6
T
6
KMAN05MG05