USE AND MAINTENANCE MANUAL FOR
JIB CRANE
-
GRL SERIES
36
•
If during the entire storage period, these values do not comply with what is indicated, it will be necessary
to perform some preliminary tests before putting the crane into service (see paragraph 4.5.2)
•
If the temperature goes above or drops below the indicated values and the relative humidity is greater
than 80% prepare protection packaging for the parcels with sacks and hygroscopic salts.
•
Storage in outdoor areas requires:
wedges to lift off the floor for all parcels without pallet
protect all parcels with sacks and hygroscopic salts
if the crane has been built to operate outdoors the metal work parts do not require particular
protections; on the contrary the parts machined on machine tool (machined surfaces, wheels, pins,
etc.) must be protected with antioxidant products (transparent paints, grease, etc.).
4.5.2 Resetting after storage
Before putting a jib crane back into operation after a long period of
storage, it is necessary to perform the following operations:
•
Structure:
eliminate traces of lubrication from the structure and the trolley beam
go over the hole threading and eliminate any grease residue
cleaning the matching surfaces used for assembly
repair any structural damage (scratched surfaces, crumbling paint, etc.)
•
Mechanisms:
check for any leaks and top up lubricant levels, if necessary
check the correct fixing of the mechanisms to the structure
eliminate traces of oxidation from the accessory sliding parts of the control parts
lubricate the bearings and unpainted mechanical parts (shafts, pins, etc.)
eliminate any water residue in the concave parts
•
Electrical equipment:
eliminate any condensation from the motors and connector blocks; dry with jets of air
check the conditions and operation of the brakes
accurately clean the surfaces of the brakes eliminating any traces of moisture, lubricants and paints
check the conditions and operation of the limit switches
check the conditions of the electrical parts and components
dry the contactor contacts
accurately clean the closing surfaces and the threaded holes of all containers
check the movement of the electric lines with festoons
carefully check the operation of the control pushbutton panel
Summary of Contents for GRL Series
Page 2: ......
Page 14: ...USE AND MAINTENANCE MANUAL FOR JIB CRANE GRL SERIES 10 Fixing systems for jib cranes ...
Page 64: ......