USE AND MAINTENANCE MANUAL FOR
JIB CRANE
-
GRL SERIES
20
4.2.2 Transport
•
The transport must be performed by qualified shippers able to guarantee correct handling of the
transported material.
•
Avoid placing parcels on the parts of the jib crane or other packaged parts that could cause damage
during the transport.
•
During transport phases it is advisable that the pallets or crates/cages not be turned over or upside
down, to avoid dangerous changes in their barycentre and to thus constantly guarantee the best
stability for them.
DONATI SOLLEVAMENTI S.r.l. shall not be held liable for transports made by the
customer or shippers chosen by the customer.
4.2.3 Handling
To move the jib crane, proceed as follows:
•
Prepare a limited and adequate area, with flat flooring or ground, for unloading and placing the bulk
metalwork parts and components contained in the packaging on the ground.
•
Based on the type of part/component or the packaging, prepare the equipment necessary for unloading
and handling of the crane parts and its accessories taking into account their weight, overall dimensions
and gripping and/or suspension elements.
•
Unloading and handling may be performed by crane (e.g. mobile cranes, bridge cranes, etc.) or forklifts,
with adequate capacity and characteristics and the use of special equipment is not required.
•
The parcels of any accessories with a weight less than 30 kg (unlike those with a weight greater than
30 kg) do not show any indication of their weight and can be handled by hand.
•
Sling the crane parts with suitable equipment in order not to damage the painted surfaces. (fig. 15)
o
for columns and arms use stay bolts with rope or chain with end hooks positioned in the indicated
points or slings with a textile fibre band and “loop” in a barycentric position or in the indicated
lifting points.
•
Very carefully grip and move the crane parts and its accessories to the area set up for unloading and
avoid swinging, tilting and any dangerous unbalancing.
•
When they have been moved check that the parts and parcels are intact and free from damage.
•
Moving of the jib crane parts and relative accessories must be done very carefully
and with adequate lifting and transport means, in order not to generate hazards
due to the risk of a loss of stability.
•
All of the parts or components must be placed or fixed stably in all phases or the
movement, transport and storage phases and must not be flipped over or placed
vertically or on their sides (fig. 16).
fig. 15
fig. 16