3.3.5 BATTERY LVD Switch
This switch enables to open the LVD(Low Voltage Disconnect). It is used to open
the connection between battery and rectifier by force. For installation or
extension of the battery, pull out the switch to the OPEN side. For normal
operation, the switch should be placed at the NORMAL position to receive
battery backup.
Figure 12. LVD Switch
3.3.6 Installation of BATT Monitoring Module
The BATT monitoring module measures output current, temperature of each
battery bank, and the voltage of battery cell, and informs the result to control
panel. Each battery can accommodate max. 6 banks.
LVD SWTICH