Transmission
MT-7
8.Remove the elastic collar and remove the ball bearing
(only if it is necessary to replace the bearing);
9.Remove the mainshaft rear ball bearing elastic ring, set
the extractor in the slot of the elastic ring, then take
down the bearing;
10.Take down the synchronizer baulk ring of the 5th and
6th speed gear;
Note:
Make marks on the baulk ring in order to distin-
guish.
11.Make use of a crane or hoist to lift the mainshaft out
from the transmission housing and make the front end
of the mainshaft uptilted;
Summary of Contents for DFA1101GZ5AD6J-907
Page 1: ...DFA1101GZ5AD6J 907 SERVICE MANUAL DONGFENG AUTOMOBILE CO LTD 2006 05 ...
Page 24: ...Clutch CL 8 ...
Page 34: ...Transmission MT 9 16 Lift the countershaft out by using crane or hoist Transmission mainshaft ...
Page 63: ...Transmission MT 38 ...
Page 123: ...Brake System BR 12 ...
Page 131: ...Cab BF 7 Cab External Trims ...
Page 133: ...Cab BF 9 Front and rear window Cab door seal strip ...
Page 134: ...Cab BF 10 Door outside molding Foot step shield and mat ...
Page 149: ...Air conditioner and Heater BF 25 Schematic Circuit of Air condition System ...
Page 150: ...Air conditioner and Heater BF 26 ...
Page 165: ...Electric and Instrument EL 14 Electric wiring diagram ...