Transmission
MT-18
5.Make use of tools to take out the gear shift fork of the
reverse gear, 5th and 6th speed gear, and the spring pin
of every guide block;
6.Knock down the 5th and 6th speed or reverse gear shift
shaft, and then take down the interlocked pin, reverse
gear or 5th and 6th speed gear shift fork and steel ball;
7.Knock out the 1st and 2nd gear shift fork spring pin,
and then the 1st and 2nd gear shift fork and 3rd and 4th
speed gear guide block shaft.
Transmission top cover
1.Take down the elastic ring, and then remove the select
rocker arm and O-ring;
Summary of Contents for DFA1101GZ5AD6J-907
Page 1: ...DFA1101GZ5AD6J 907 SERVICE MANUAL DONGFENG AUTOMOBILE CO LTD 2006 05 ...
Page 24: ...Clutch CL 8 ...
Page 34: ...Transmission MT 9 16 Lift the countershaft out by using crane or hoist Transmission mainshaft ...
Page 63: ...Transmission MT 38 ...
Page 123: ...Brake System BR 12 ...
Page 131: ...Cab BF 7 Cab External Trims ...
Page 133: ...Cab BF 9 Front and rear window Cab door seal strip ...
Page 134: ...Cab BF 10 Door outside molding Foot step shield and mat ...
Page 149: ...Air conditioner and Heater BF 25 Schematic Circuit of Air condition System ...
Page 150: ...Air conditioner and Heater BF 26 ...
Page 165: ...Electric and Instrument EL 14 Electric wiring diagram ...