Transmission
MT-31
6.After install the interlocked pin to the reverse gear fork
shaft, press to assemble the reverse gear fork shaft
through the hole of the transmission upper cover, then
install the reverse gear guide block and gear shift fork;
7.Install the guide bolt;
Tightening torque: 40N.m
8.Assemble the plug and spacer on the two ends;
9.Install the spring pin on every shaft;
Note:
When installing the spring pin to the gear shift fork
shaft and the guide block shaft, the gap of the spring pin
has to align with the direction of the shaft.
Summary of Contents for DFA1101GZ5AD6J-907
Page 1: ...DFA1101GZ5AD6J 907 SERVICE MANUAL DONGFENG AUTOMOBILE CO LTD 2006 05 ...
Page 24: ...Clutch CL 8 ...
Page 34: ...Transmission MT 9 16 Lift the countershaft out by using crane or hoist Transmission mainshaft ...
Page 63: ...Transmission MT 38 ...
Page 123: ...Brake System BR 12 ...
Page 131: ...Cab BF 7 Cab External Trims ...
Page 133: ...Cab BF 9 Front and rear window Cab door seal strip ...
Page 134: ...Cab BF 10 Door outside molding Foot step shield and mat ...
Page 149: ...Air conditioner and Heater BF 25 Schematic Circuit of Air condition System ...
Page 150: ...Air conditioner and Heater BF 26 ...
Page 165: ...Electric and Instrument EL 14 Electric wiring diagram ...