Transmission
MT-35
8.Install the ball bearing, spacer sleeve, speedometer
drive gear, gasket and bearing seat in sequence;
Tightening torque:
M12 59~79N.m
M14 93~124N.m
9.Install the 5th and 6th speed gear synchronizer baulk
ring;
10.Press to install the ball bearing onto the drive gear
shaft, and then assemble the elastic ring;
11.Assemble the drive gear shaft assembly;
Summary of Contents for DFA1101GZ5AD6J-907
Page 1: ...DFA1101GZ5AD6J 907 SERVICE MANUAL DONGFENG AUTOMOBILE CO LTD 2006 05 ...
Page 24: ...Clutch CL 8 ...
Page 34: ...Transmission MT 9 16 Lift the countershaft out by using crane or hoist Transmission mainshaft ...
Page 63: ...Transmission MT 38 ...
Page 123: ...Brake System BR 12 ...
Page 131: ...Cab BF 7 Cab External Trims ...
Page 133: ...Cab BF 9 Front and rear window Cab door seal strip ...
Page 134: ...Cab BF 10 Door outside molding Foot step shield and mat ...
Page 149: ...Air conditioner and Heater BF 25 Schematic Circuit of Air condition System ...
Page 150: ...Air conditioner and Heater BF 26 ...
Page 165: ...Electric and Instrument EL 14 Electric wiring diagram ...