background image

2

This manual describes installation of DoorHan industrial sectional door of 

ISD ThermalPRO series with standard component parts.

This manual contains important safety, installation and maintenance 

instructions. Please keep this manual for future reference.  

If you should require any assistance or additional information, please 

contact DoorHan service department (ref. «Service department» paragraph).

GENERAL INSTALLATION INSTRUCTIONS

Only the component parts specified and supplied with the door 
should be used.

Do not permit children to be around the door during its installation.

Follow the instructions provided with the electric operator during 
its installation.

Before starting door installation make sure the door opening is 
properly prepared and suitable for installation.

The door opening shall always be free of any foreign objects.

Calculation and connection of the heating circuit, supply cable 
and cable between boxes is performed by the door installer.

INSTALLATION TEAM

The optimal number of installation team — 2 people. If the door is to be equipped 

with an operator or a heating circuit the team should include a qualified electrician.

Estimated time of door assembly is 3,5 hours.
Door installation shall be performed by a team which have been trained at 

DoorHan training centre and got a corresponding certificate.

The team should use proper tools specified at page 3.

INSTALLATION REQUIREMENTS

The guides must be installed vertically, which can be checked by a water level.
Diagonals of horizontal tracks shall be equal (allowable deviation is ± 5 mm).
Connect the door parts strictly following installation instructions.
Side seals and gaskets of the panel shall be strictly in line, gaps are not allowed.
Spring tensioning shall be performed with a special tap wrench (ref. page 17, 

fig. 13,1a, 13.1b).

The spring is tensioned for a particular number of turns (ref. page 16, fig. N). 

Fasten the spring end with a bolt applying force of maximum 15 N·m.

After spring tensioning please verify that the split pin (ref. page 17, fig.13.3a, 

13.3b) is removed from the spring break safety device.

Mounting options:
а) if the wall around the opening is strong enough to support the door (whole 

brick, solid concrete, metal channels) it can be attached directly to the wall;

b) if the wall material has low strength (hollow brick, silicate block, low 

compressive strength concrete, wood, etc.), then it is required to frame the opening 
with steel profiles.

Before installation, please ensure that the content of your door kit is complete 

as per the specification included in the package. 

HEATING CABLE SPECIFICATIONS

Input voltage — 220 V.
Power per 1 m — 30 W.
Operating temperature: -60…+200 °С (up to +230 °С for a short time).
Minimum bending diameter: 15 mm.

RESPONSIBILITY FOR INSTALLATION

DoorHan does not directly control the installation, maintenance and operation of 

a sectional door and is not responsible for the safety and quality of the installation.

The contents of this manual can not serve as the basis for submitting any 

complaints to the manufacturer.

The installation company is held responsible for the quality of sectional door 

installation.

DoorHan reserves the right to introduce any changes to this manual without any 

prior notice to the customer.

DOOR OPERATION

Door shall be lifted and lowered with ease.
Door leaf shoulld be properly balanced: it shall not spontaneously lower or lift.
For opening the door in manual operation use only the door handle.
Door can only be locked with a special latch or mechanical lock.
Keep the door operating area clear of children, animals and foreign objects.

EMERGENCY SITUATIONS

In case of door failure never perform repair works by yourself. We recommend 

to call the service department.

In case a safety device was actuated please verify that nobody was injured. Call 

the service department.

If the door opens with a difficulty make sure that all door components are in 

good working order and then adjust. If there are any damaged components please 
call the service department.

SERVICE DEPARTMENT

Should you require any assistance or additional information please contact the 

service department at the following addresses:

а) support@doorhan.com,
b) at the address of product purchase.
You can contact your dealer on any question arising during door operation. For 

addresses and phone numbers see the Contract.

SAFETY INSTRUCTIONS

If the heating circuit is to be installed please do the following: 
1. Pre-installation verification.

1.1. Make sure the quantity and numbers of the heating cable and its 

components correspond to the data listed in the installation chart.

1.2. Verify that the heating cable and its components were not damaged 

during transportation.

1.3. Verify that the rated supply voltage of the heating cable corresponds to 

the supplied operating voltage.

2. Heating cable installation.

2.1. When installing the cable, avoid sudden jerks and excessive force, as 

well as walking on the cable and passing it over with a vehicle. If the heating cable is 
left at the installation site for some time, it must be protected from moisture. 

ATTENTION!

In case of failure or incorrect operation of the heating cable, upon detection of 

smoke or unusual odour it is required to contact the service department.

WARNING!

As with any electrical equipment operating from high voltage, damage to the 

heating cable and heating components or improper installation can lead to moisture 
penetration into the system or its contamination, which can result in short circuit, 
sparking and fire outbreak.

Do not connect heating cable conductors to each other as it will cause short 

circuit. All unconnected heating cable ends must be insulated with cable end sealing.

To prevent fire or explosion in hazardous areas, ensure that the maximum 

temperature of the heating cable sheath is below the self-ignition temperature of the 
gases in the hazardous area. Heating system installation shall be performed using 
only corresponding spare parts with observation of installation instructions attached 
to them.

Heating circuit installation can be performed by personnel:
- trained and certified for basic fire safety;
- having at least the first qualification group on electrical safety;
- qualified in electrical safety instructions;
- having knowledge of first aid for burns and electric shock.

GENERAL INFORMATION

Summary of Contents for THERMALPRO Series

Page 1: ...DoorHan 04 2019 INDUSTRIAL SECTIONAL DOOR OF ISD THERMALPRO SERIES Installation and Operation Manual GENERAL INFORMATION 2 TOOLS 3 DOOR COMPONENT PARTS 4 DOOR INSTALLATION 6...

Page 2: ...any is held responsible for the quality of sectional door installation DoorHan reserves the right to introduce any changes to this manual without any prior notice to the customer DOOR OPERATION Door s...

Page 3: ...t installation structural element dismantling use water level number of spring turns apply force standard lift type drill the hole 1 5 m 300 g 8 m S10 S13 S10 S13 S17 13 mm 10 mm 6 mm 4 2 mm M8 u 16 A...

Page 4: ...4 S DOOR COMPONENT PARTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 S 16...

Page 5: ...5 DOOR COMPONENT PARTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 S S S S...

Page 6: ...INSTALLATION 1 1 min 120 mm 150 mm min 120 mm 150 mm min 150 mm 1 2 B1 B2 2 2 2c 2 _ d 2 _ a 4 2 mm 2 _ b 2 _ b 8 5 3 6 E E with heating circuit optional 1 2 3 4 5 6 7 8 2 3 5 1 2 2 1a 2 2a 2 3a 2 1b...

Page 7: ...7 DOOR INSTALLATION R R 305 mm R 381 mm R 4 _ 5 _ 3 _ 3 _ b 1 1 4 1 4 1 4 2 3 7 3 13 E E E 27 4 E 2 1d 2 2d 2 2d 2 2d 2c 3...

Page 8: ...8 S S 14 28 S S 3 14 C 10 mm 3 13 3 13 13 C C 27 25 mm 25 mm 25 30 mm 25 30 mm 13 14 27 28 29 B 29 27 3 _ b 4 _ a 4 _ b 3 1a 3 2a 3 3a 10 mm 4 4 1a 4 2a 4 3a DOOR INSTALLATION...

Page 9: ...9 S 10 mm S 14 3 S 3 13 S 5 1 2 mm 5 13 27 B 4 4a 4 1b 4 2b 4 2b 3 1b 3 2b DOOR INSTALLATION...

Page 10: ...10 5 _ 5 _ c 5 _ b 5 1 5 2 10 mm 12 13 16 13 13 15 12 31 16 31 10 9 A D A C 12 16 D 5 5 1b 5 2b 5 1a 5 2a 5 1c 5 2c DOOR INSTALLATION...

Page 11: ...11 6 1 6 2 A B r 5 mm 6 _ c 6 _ 6 _ b 9 10 11 12 13 16 13 13 16 D D 12 31 12 16 A D 31 6 1b 6 2b 6 5 3c 6 1a 6 2a DOOR INSTALLATION...

Page 12: ...12 7 1 7 3 _ 7 2 7 2 10 mm 16 23 16 23 11 11 2 5 7 A C E E 3 23 6 1c 6 2c 6 3c 6 4c 7 7 1 DOOR INSTALLATION...

Page 13: ...13 8 _ a 1 2 mm 5 1 5 8 22 1 4 1 4 8 22 1 4 1 4 4 B 7 3a 7 3b 8 8 5a 8 1a 8 2a 8 3a 8 4a 4 4 8 22 8 7a 8 8a 8 9a 8 6a DOOR INSTALLATION...

Page 14: ...14 9 _ 10 _ D S 17 17 17 17 17 17 A C C S S S 9 9 1 9 2 10 10 1 10 2 10 3 10 mm 10 mm DOOR INSTALLATION...

Page 15: ...15 11 _ 11b 19 19 17 17 17 19 32 18 A C 19 26 11 11 1 11 2a 11 3 11b 10 mm DOOR INSTALLATION...

Page 16: ...16 12 _ 12 _ b 13 _ a 13 _ b Number of cable turns when max 15 N m 20 19 6 19 21 12 12 1 12 2 12 2 12 1b 13 DOOR INSTALLATION door is closed...

Page 17: ...17 L R max 15 N m L1 L2 L1 L2 L1 z L2 L1 L2 14 _ max 15 N m 21 21 13 1a 13 1b 13 2a 13 2b 13 3a 13 3b 14 14 1 14 2 DOOR INSTALLATION...

Page 18: ...18 2 3 24 2 3 2 3 24 3 25 3 25 3 E C 4 2 mm 4 2 mm 6 6 E E 33 15 15 1 15 2 15 3 15 4 15 5 15 6 15 7 DOOR INSTALLATION...

Page 19: ...19 16 16 1 16 2 30 30 30 30 C 10 mm 16 3 DOOR INSTALLATION...

Page 20: ...20 b a 220 V N z L z Pe z N z L z Pe z N z L z Pe z 220 V a 16 16 1a 16b 16 2b DOOR INSTALLATION door leaf heating contour frame heating contour...

Page 21: ...21 NOTES...

Page 22: ...22 NOTES...

Page 23: ...23 NOTES...

Page 24: ...ur company and believe you will be satisfied with its quality For acquisition distribution and maintenance please contact your local DoorHan representative or the central office at Kadan 43201 Czech R...

Reviews: