background image

23

NOTES

Summary of Contents for THERMALPRO Series

Page 1: ...DoorHan 04 2019 INDUSTRIAL SECTIONAL DOOR OF ISD THERMALPRO SERIES Installation and Operation Manual GENERAL INFORMATION 2 TOOLS 3 DOOR COMPONENT PARTS 4 DOOR INSTALLATION 6...

Page 2: ...any is held responsible for the quality of sectional door installation DoorHan reserves the right to introduce any changes to this manual without any prior notice to the customer DOOR OPERATION Door s...

Page 3: ...t installation structural element dismantling use water level number of spring turns apply force standard lift type drill the hole 1 5 m 300 g 8 m S10 S13 S10 S13 S17 13 mm 10 mm 6 mm 4 2 mm M8 u 16 A...

Page 4: ...4 S DOOR COMPONENT PARTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 S 16...

Page 5: ...5 DOOR COMPONENT PARTS 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 S S S S...

Page 6: ...INSTALLATION 1 1 min 120 mm 150 mm min 120 mm 150 mm min 150 mm 1 2 B1 B2 2 2 2c 2 _ d 2 _ a 4 2 mm 2 _ b 2 _ b 8 5 3 6 E E with heating circuit optional 1 2 3 4 5 6 7 8 2 3 5 1 2 2 1a 2 2a 2 3a 2 1b...

Page 7: ...7 DOOR INSTALLATION R R 305 mm R 381 mm R 4 _ 5 _ 3 _ 3 _ b 1 1 4 1 4 1 4 2 3 7 3 13 E E E 27 4 E 2 1d 2 2d 2 2d 2 2d 2c 3...

Page 8: ...8 S S 14 28 S S 3 14 C 10 mm 3 13 3 13 13 C C 27 25 mm 25 mm 25 30 mm 25 30 mm 13 14 27 28 29 B 29 27 3 _ b 4 _ a 4 _ b 3 1a 3 2a 3 3a 10 mm 4 4 1a 4 2a 4 3a DOOR INSTALLATION...

Page 9: ...9 S 10 mm S 14 3 S 3 13 S 5 1 2 mm 5 13 27 B 4 4a 4 1b 4 2b 4 2b 3 1b 3 2b DOOR INSTALLATION...

Page 10: ...10 5 _ 5 _ c 5 _ b 5 1 5 2 10 mm 12 13 16 13 13 15 12 31 16 31 10 9 A D A C 12 16 D 5 5 1b 5 2b 5 1a 5 2a 5 1c 5 2c DOOR INSTALLATION...

Page 11: ...11 6 1 6 2 A B r 5 mm 6 _ c 6 _ 6 _ b 9 10 11 12 13 16 13 13 16 D D 12 31 12 16 A D 31 6 1b 6 2b 6 5 3c 6 1a 6 2a DOOR INSTALLATION...

Page 12: ...12 7 1 7 3 _ 7 2 7 2 10 mm 16 23 16 23 11 11 2 5 7 A C E E 3 23 6 1c 6 2c 6 3c 6 4c 7 7 1 DOOR INSTALLATION...

Page 13: ...13 8 _ a 1 2 mm 5 1 5 8 22 1 4 1 4 8 22 1 4 1 4 4 B 7 3a 7 3b 8 8 5a 8 1a 8 2a 8 3a 8 4a 4 4 8 22 8 7a 8 8a 8 9a 8 6a DOOR INSTALLATION...

Page 14: ...14 9 _ 10 _ D S 17 17 17 17 17 17 A C C S S S 9 9 1 9 2 10 10 1 10 2 10 3 10 mm 10 mm DOOR INSTALLATION...

Page 15: ...15 11 _ 11b 19 19 17 17 17 19 32 18 A C 19 26 11 11 1 11 2a 11 3 11b 10 mm DOOR INSTALLATION...

Page 16: ...16 12 _ 12 _ b 13 _ a 13 _ b Number of cable turns when max 15 N m 20 19 6 19 21 12 12 1 12 2 12 2 12 1b 13 DOOR INSTALLATION door is closed...

Page 17: ...17 L R max 15 N m L1 L2 L1 L2 L1 z L2 L1 L2 14 _ max 15 N m 21 21 13 1a 13 1b 13 2a 13 2b 13 3a 13 3b 14 14 1 14 2 DOOR INSTALLATION...

Page 18: ...18 2 3 24 2 3 2 3 24 3 25 3 25 3 E C 4 2 mm 4 2 mm 6 6 E E 33 15 15 1 15 2 15 3 15 4 15 5 15 6 15 7 DOOR INSTALLATION...

Page 19: ...19 16 16 1 16 2 30 30 30 30 C 10 mm 16 3 DOOR INSTALLATION...

Page 20: ...20 b a 220 V N z L z Pe z N z L z Pe z N z L z Pe z 220 V a 16 16 1a 16b 16 2b DOOR INSTALLATION door leaf heating contour frame heating contour...

Page 21: ...21 NOTES...

Page 22: ...22 NOTES...

Page 23: ...23 NOTES...

Page 24: ...ur company and believe you will be satisfied with its quality For acquisition distribution and maintenance please contact your local DoorHan representative or the central office at Kadan 43201 Czech R...

Reviews: