1.5 Underground Conduit Requirements
•
Operator’s setup is the same as the front
position or rear position with concrete pad
shown on page 10 and 11.
(Front upside down position shown here).
•
Junction box connection is used for the
ceiling mount installation.
Front or Rear Position Upside Down
Can be mounted on the ceiling to conserve floor space.
Note: There are
NO
fluids in the
operator that can leak out.
Chain
Stop
Ceiling
Chain Idler
Wheels
Operator
Bottom
Top View
Chain Setup
A filler post or barrier may need to be
installed between the gate and wall area
(See page 2 for more information).
Sweeps
Concrete
Pad
Primary
Operator
Position
Secondary
Operator
Position
Elbow
NO
Sweep
YES
DoorKing’s Primary/Secondary Interconnection Cable (Dual Operator Application Only)
(Secondary Power and Communication wires)
Loop Lead-In Wires (Low Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
3/4 Inch Conduit Recommended
•
The conduit requirements are for a typical slide gate operator installation (the secondary operator is shown for those
applications where a secondary operator may be used).
The conduit requirements for your application may vary from
this depending on your specific needs.
•
Use only sweeps for conduit bends. Do not use 90° elbows as this will make wire pulls very
difficult and can cause damage to wire insulation. DoorKing recommends using 3/4-inch conduit.
•
Installation of
External Entrapment Protection Devices
are
REQUIRED
(photo sensors and/or reversing edges).
•
Be sure that all conduits are installed in accordance with local codes.
•
Never
run low voltage rated wire insulation in the same conduit as high voltage rated wire insulation.
External Safety Devices, Controls and P.A.M.S. Wires (Low Voltage wire insulation)