OP000598
3-11
Operation
5.
Set engine speed control dial to "HIGH IDLE" (Figure 20).
6.
Repeat Step 4 for five minutes. If working speeds continue
to be slow, continue to operate, but use extreme caution
because the machine function may be erratic.
7.
Check for clearance and fully raise the front attachment.
Slowly swing clockwise 3 revolutions. Slowly swing
counterclockwise 3 revolutions.
8.
Travel forward and reverse at low speed for two
revolutions of the drive sprocket.
Engine Shut Down
NOTE:
Allow engine to idle for three - five minutes before
shutting down the engine. If not allowed to idle, heat
surge may develop which will damage the engine.
Allowing the engine to idle will dissipate heat.
1.
Park excavator on level and firm ground.
2.
Lower front end attachment to ground and make sure all
operating controls are in "NEUTRAL."
3.
Set safety lever on "LOCK" position (Figure 22).
4.
Set engine speed control dial to "LOW IDLE" (Figure 23).
Allow engine to idle for three - five minutes.
HAOB550L
Figure 20
FG000111
Figure 21
FG001091
Unlock
lock
Figure 22
HAOB290L
Figure 23
Summary of Contents for DX140LC
Page 2: ......
Page 67: ...OP000597 2 3 Operating Controls ...
Page 87: ...OP000597 2 23 Operating Controls ...
Page 122: ...OP000597 Operating Controls 2 58 CD Player Optional AST DIR FG000109 Figure 123 ...
Page 184: ...OP000598 Operation 3 48 ...
Page 193: ...OP000599 4 9 Inspection Maintenance and Adjustment ...
Page 272: ...OP000599 Inspection Maintenance and Adjustment 4 88 ...
Page 278: ...OP000600 Transportation 5 6 ...
Page 284: ...OP000013 Troubleshooting 6 6 ...
Page 292: ...OP000601 Specification 7 8 ...