Inspection, Maintenance and Adjustment
A.
Arm link joint pin (1 point)
B.
Link joint pin (2 points)
C.
Arm bucket joint pin (1 point)
D.
Bucket link joint pin (1 point)
E.
Bucket cylinder rod pin (1 point)
Grease Swing Bearing
1.
Position the machine on firm, level ground. Lower the front
attachment to the ground and shut down engine.
2.
There are three grease fittings for the swing bearing. Do
not over lubricate. Purge old grease with new. Remove all
purged grease.
Grease Dozer Blade Pin (Optional)
NOTE:
Grease it per 10 hours during initial period of 100
hours after buying your new machine, after which
period grease it per 50 hours.
NOTE:
In case of performing work underwater, grease it per
10 hours irrespective of elapsed period.
1.
Lower dozer blade to the ground.
2.
Inject grease at total 6 points by 3 points per dozer cylinder
by means of using grease gun.
3.
Neatly remove old grease that has leaked out after greasing.
Figure 36
A
C
D
B
B
FG009561
Figure 37
E
FG009562
Figure 38
FG009563
Figure 39
FG009564
Summary of Contents for DX140LC
Page 2: ......
Page 67: ...OP000597 2 3 Operating Controls ...
Page 87: ...OP000597 2 23 Operating Controls ...
Page 122: ...OP000597 Operating Controls 2 58 CD Player Optional AST DIR FG000109 Figure 123 ...
Page 184: ...OP000598 Operation 3 48 ...
Page 193: ...OP000599 4 9 Inspection Maintenance and Adjustment ...
Page 272: ...OP000599 Inspection Maintenance and Adjustment 4 88 ...
Page 278: ...OP000600 Transportation 5 6 ...
Page 284: ...OP000013 Troubleshooting 6 6 ...
Page 292: ...OP000601 Specification 7 8 ...