5-10
13. Make sure to secure excavator onto trailer before
transporting. Place blocking (1, Figure 172) in front of and
behind each track. Use chains or cable tie-downs (2) as
required by local transportation laws.
14. Refer to Dimensions for Transportation table and drawing
for overall machine height and width measurements. Make
sure to position excavator as shown. If not transported in
this position, height measurements may be different.
LIFTING WITH SLING
1.
Refer to “Specification” on page 7-1 of this manual for
information on weight and dimensions.
2.
Use properly rated cables and slings for lifting.
3.
Position machine for a level lift.
4.
Lifting cables should have a long enough length to prevent
contact with machine. Spreader bars may be required.
NOTE:
If spreader bars are used, be sure that cables
are properly secured to them and that angle of
cables is factored into lift strength.
FG015857
1
1
2
Figure 172
Figure 173
WARNING
Improper lifting can allow load to shift and cause injury or
damage.
Summary of Contents for DX700LC
Page 2: ......
Page 72: ...OP001120 Safety 1 66 ...
Page 142: ...OP001121 Operating Controls 2 70 ...
Page 188: ...OP001122 Operation 3 46 ...
Page 197: ...OP001123 4 9 Inspection Maintenance and Adjustment ...
Page 282: ...OP001123 Inspection Maintenance and Adjustment 4 94 ...
Page 298: ...OP000030 Troubleshooting 6 6 ...
Page 301: ...OP001125 7 3 Specification ...
Page 308: ...OP001125 Specification 7 10 ...
Page 314: ...950106 00012E Index 8 6 ...