7-4 Specifications
022-00029AE Operation and Maintenance Manual
WORKING CAPACITIES
BUCKET CAPACITY
Standard toothed bucket has a capacity of 4.8 m
3
(6.28 yd
3
). An optional bucket equipped with a cutting
edge and no teeth has a capacity of 5.0 m
3
(6.54 yd
3
).
TIPPING LOAD
Static Tipping Load with bucket in Over Front position is 22,000 kg (48,500 lb). With bucket in Fully Turned
position, Static Tipping Load is 19,000 kg (41,890 lb).
MATERIAL WEIGHT
The data below describes weight of a cubic meter (cubic yard) of many types of workload materials.
APPROXIMATE WEIGHT OF WORKLOAD MATERIALS
MATERIAL
LOW WEIGHT OR
DENSITY
1,100 KG/M
3
(1,850 LB/YD
3
), OR
LESS
MEDIUM WEIGHT OR
DENSITY
1,600 KG/M
3
(2,700 LB/YD
3
), OR
LESS
HIGH WEIGHT OR
DENSITY
2,000 KG/M
3
(3,370 LB/YD
3
), OR
LESS
Charcoal
401 kg/m
3
(695 lb/yd
3
)
---------------------
---------------------
Coke, blast furnace
size
433 kg/m
3
(729 lb/yd
3
)
---------------------
---------------------
Coke, foundry size
449 kg/m
3
(756 lb/yd
3
)
---------------------
---------------------
Coal, bituminous slack,
piled
801 kg/m
3
(1,350 lb/yd
3
)
---------------------
---------------------
Coal, bituminous r. of
m., piled
881 kg/m
3
(1,485 lb/yd
3
)
---------------------
---------------------
Coal, anthracite
897 kg/m
3
(1,512 lb/yd
3
)
---------------------
---------------------
Clay, DRY, in broken
lumps
1,009 kg/m
3
(1,701 lb/yd
3
)
---------------------
---------------------
Clay, DAMP, natural
bed
---------------------
1,746 kg/m
3
(2,943 lb/yd
3
)
---------------------