dormakaba ED50/ED100/ED250 OHC Header
Setup and Troubleshooting Instructions
Chapter 14
14.1 Customer supplied doors - pair door installation
14 Pair door installation
Fig. 14.1.1 Pair door inswing example; ready for door installation
1
Overhead arm
rotated to 70
degrees or greater
2
Floor pivot
NOTICE
Door, jambs, and finger guards by customer.
Door installation:
Customer responsibility.
WARNING
Door installation must meet ANSI/BHMA
standards as well as any applicable local
building codes.
14.1.1 Conditions prior to installing doors.
1. System setup (Chapter 11) performed for each
ED operator.
2. Overhead arms rotated to 700 open position or
greater.
14.1.2 Floor pivots installed by customer.
1. Floor pivots installed by customer.
CAUTION
Jamb edge to floor pivot centerline distance:
3 3/4". Reference Paa. 12.3.
2. Bottom pivot hardware installed in floor by
customer for both doors.
14.1.3 Check ED operator axle to floor pivot plumb.
NOTICE
Using plumb bob, check ED operator axle to
floor pivot plumb for each door.
14.1.2 Hang doors - reference single door installation.
1. Reference steps in Chapter 12, single door to hang
each door.
2
2
1
1
14.2 Perform learning cycle for each door
14.2.1 Perform learning cycle for each door.
• Reference Chapter 12, Para. 12.6.
14.3 Set power fail closing speed
14.1.2 Set power fail closing speed for each door.
• Reference Chapter 13.