Installation
Technical Manual
73
V28 - 08/2019
Electronic safe lock
•
Output 2 = bolt or motor open
•
Input 1 = controlled disabling
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
GND
+12V / 20mA
...
14.9
Wiring check of the lock
Requirements:
To perform a wiring check, all doors and drawers must be open.
If during the wiring check the error message LINE OFF appears continuously:
•
Make sure that all connecting cables are connected correctly.
•
Make sure that no connecting cable is damaged.
•
Disconnect the connecting cables and replace them, if necessary.
•
Connect the connecting cables again.
•
Make sure that new batteries were put into the battery compartment, see Device Man-
ager (bus system test).
•
If another error message appears, see Troubleshooting.
14.10
Wiring check of the eBox
After finishing the installation, the Axessor CIT electronic safe lock is commissioned:
•
Conduct wiring check.
•
After an initialization period if the eBox is connected, the LED blinks twice green every 2
seconds.