TOP MODULE INSTALLATION
Use a level on the interior module and exterior thru-bolt plate to ensure module is level.
Fasten module to door with (2) stamped washer and carriage bolts, from the exterior.
Tighten 1/4"-20 K Lock Nut and then tighten 5mm hex nut securely.
Once level, secure in place with #14 self-drilling screw in recess as shown.
Slide the channel (both overlapping segments of the channel) over the vertical rod.
The crimped wide end of the channel should point towards the lock body.
Slide the upper narrow segment of the channel down to reveal the vertical rod with loop.
( Note: Loop on the vertical rod should always face towards the hinge
side of the door as shown )
. Connect the top portion of the vertical rod with loop
to the module by removing the bridge clip and placing the loop on the rod over the
connecting arm pin. Then replace the bridge clip.
Slide upper segment of the channel up to conceal the vertical rod and insert
it into upper module. Approximately ½
”
of channel should rest on top module back plate.
The crimped segment should fit snugly into the lock body housing.
Slide the crimped segment of the channel up to reveal the slotted end of the rod. Hook the
rod holder into the slots on the rod. Use the Quick Connect Pin to secure them together.
Fasten both overlapping segments of the channels together with self-drilling screw
on the side.
Place cover over module and channel. Insert and secure Allen key threaded cap nut.
BOTTOM MODULE INSTALLATION
Repeat above steps for bottom module installation.
SSRLS-3 / SSRLU-3
Installation Instructions
A
B
#14 Self Drilling Screw
Bridge Clip
Vertical rod with loop
Vertical rod with
loop
C
F
E
Quick
Connect
Pin
D
B
C
D
E
F
G
Rod
Holder
INS SSRLS_SSRLU-3 v10.2.vsd Created: 5-14-2018 Revised: 5-14-2018
Page 5
G
A
Narrow End
Channel
Crimped Wide
End Channel
Loop
Connecting Arm Pin
Hinge Side of the Door
LHR
RHR
Loop
Connecting Arm Pin
Hinge Side of the Door
C
5mm Hex Nut