46
ED50
08-2018
DL4614-140
dormakaba ED50 OHC Installation Instructions
Chapter 22
22.1 Install ED50 operator in LH side of header
Fig. 22.1.1 Mounting plate orientation for LH side of header
22 Install ED50 OHC operator and
hardware; LH side of header
2
2
2
2
2
2
2
2
1
6
5.1
5
3
4
2
1
1.1
1.3
1.2
1
ED50 OHC
mounting plate,
right side of header
orientation
2
Mounting holes for
operator
3
Low voltage terminal
module
Fig.22.1.2 Header with ED50 OHC operator and hardware installed
22.2 Install ED50 operator on mounting plate
1
ED50 OHC operator
1.1
Control board
1.2
Output shaft
1.3
ED50 OHC operator
115 VAC cable
2
Ribbon cable
3
Low voltage terminal
board module
4
115 Vac power
extension cable DX4647
5
115 Vac power module
5.1
Main power cable
1
M6 x 10 SHCS
2
M6 x 20 SHCS
3
Mounting plate
22.2.1 Install ED50 OHC operator on
mounting plate
1. Operator protective film strips must be
removed! Reference Chapter 21.
2. Install ED50 OHC operator onto
mounting plate.
3. Use 5 mm T handle hex key to thread
eight M6 SHCS into their mounting plate
holes.
4. Tighten all eight M6 SHCS.
Fig. 22.2.1 ED50 operator fastener locations
2
2
2
2
1
1
1
1
DK3772-010
6
Ground lug kit
DK4656-010
TIPS AND RECOMMENDATIONS
• Reference Chapter 17, Para.
17.1 for detail on operator to
mounting plate fastening.
• Reference Chapter 21 for
operator bottom view of
fasteners.