30
ED50LE
09-2021
DL4616-002
dormakaba ED50LE operator – Fine cover
Installation Instructions
Chapter 10
10 Pull arm installation
10.1 Pull arm installation
10.2 Pull arm assemblies
10.3 Pull arm hardware
1
Track
2
End cap
3
Fixing piece
3.1
M5 x 15 Phillips
FHS
4
Pull arm
5
20 mm axle
extension
5.1
Splined
6
CPD lever
6.1
M6 x 10 SHCS
7
Slotted spring pin
8
Arm cap
9
Slide shoe
10
Pivot pin
11
Retaining ring
12
Bumper
13
M8 x 1.25 x 40
SHCS
14
Wood screws
15
Machine screws
16
Bumper stop
17
M5 x 13 FHMS
cross recessed
Fig. 10.2.1 Arm with CPD lever and track
assembly, LH
1
Drive arm
2
CPD
3
Track
Fig. 10.2.2 Arm with CPD lever and track
assembly, RH
1
2
3
3.1
4
2
3
3.1
5
5.1
6
7
8
9
10
11
12
13
14
16
17
NOTICE
Reference Chapter 7 – Installation templates.
1
2
3
1
2
3
NOTICE
Double door pull arm installation.
Double door pull as a push installation.
Repeat steps in Chapter 10 for each pull arm
installation.
Fig. 10.3.1 Pull arm assembly HK4709-12X