28
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 12
12 ED900 installation overview
12.1 Installation preparation
WARNING
Review safety information in Chapter 3!
WARNING
ED900 system should be installed by trained
and knowledgeable installers experienced in
installation and commissioning of swing door
operators.
The installer should be familiar with all
applicable local and national building code
requirements, and with requirements of
current ANSI/BHMA standard A156.19, Power
Assist and Low Energy Power Operated
Doors.
12.1.1 dormakaba USA, Inc. ED900 hardware.
1. Locate shipping boxes for ED900 operator and
hardware.
NOTICE
Installation steps listed in Chapter 14 through 17
are a recommendation. Structural, local
conditions, available tools, or other factors or
circumstances may require modification to
these steps.
12.1.2 Door frame and door.
CAUTION
Insure area around door frame, adjacent walls
and door is readily accessible and free of
objects and debris.
12.1.3 Accessories
1. Verify accessories planned for or in place for the door.
Chapter 9, system accessories, list typical accessory
types for ED900 operators.
TIPS AND RECOMMENDATIONS
Accessory wiring to ED900 operator should be
planned for prior to operator installation.
12.1.4 ED900 mounting plate installation preparation.
CAUTION
Using applicable ED900 installation template
(Chapter 13), holes for mounting plate
fasteners must be located and drilled into door
frame, wall or substructure prior to mounting
plate installation.
CAUTION
Mounting plate installation must be orientated
with 115 Vac connection towards door hinge side.
12.1.5 ED900 mounting plate extension used with
optional full door width cover.
TIPS AND RECOMMENDATIONS
Mounting plate extension is included
for full width cover installation.
• Reference Chapter 15.
12.1.6 ED900 115 Vac electrical installation.
WARNING
Work on electrical equipment and 115 Vac
wiring installation must be performed only by
qualified personnel
!
WARNING
Electrical shock hazard! 115 Vac branch circuit
disconnect for ED900 must be Off prior to
start of electrical installation.
WARNING
115 Vac wiring to ED900 operator must
conform to local and national electrical codes.