57
ED900
02-2020
08125330
dormakaba ED900 Installation Instructions – Double egress door
Chapter 16
16 J/Push arm installation
NOTICE
Reference Chapter 13 for push arm installation
templates.
Fig. 16.1.1 Push arm assemblies
1
J8/Standard push
arm, reveal depths
0 - 8" maximum
2
J12/Deep push arm
reveal depths
8 - 12" maximum
16.2 Push arm installation
Fig. 16.2.1 J8/Splined push arm assembly, 8 7/8" [225]
1
Splined drive arm
2
Socket
4
Adjustment arm
11 1/4"[285]
5
Adjustment arm
tube 12 1/4" [311]
6
Shoe
7
M6 x 10 mm flanged
button head screw
8
Ball head
11
Shoe screw cover
12
M8 x ___ SHCS
13
Cap
Fig. 16.2.2 J12/Splined push arm assembly, 19 11/16" [500]
1
Splined drive arm
2
Socket
6
Shoe
7
M6 x 10 mm flanged
button head screw
8
Ball head
9
Adjustment arm,
17 3/4" [450]
10
Adjustment arm
tube, 17 3/4" [450]
11
Shoe screw cover
12
M8 x ___ SHCS
13
Cap
16.1 Push arm installation templates
2
1
4
5
7
6
8
11
1
12
2
13
1
2
8
10
9
7
6
11
12
13