background image

© 2017 RutheRfoRd ContRols Int’l | dormakaba Group

www.rutherfordcontrols.com • Phone: 1.800.265.6630 • fax: 1.800.482.9795 • e-mail: sales@rutherfordcontrols.com

C

7104, 7304  

Aluminum Frames, 1-1/2” D

4104, 4304  

Aluminum Frames, 1-1/2” D

Any modular A41A43A71 or A73  

with B4704 faceplate

MEASUREMENT

FRACTIONAL

INCHES

DECIMAL

INCHES

METRIC

mm

 A  1-1/4  1.250  31.75
 B  4-7/8  4.875  123.83
 C  3-3/8  3.375  85.73
 D  7/8 

.875  22.23

 E  3/8 

.375  9.53

  F 

1/8* 

.125*    3.18*

  G 1-11/16  1.688  42.86
   Vertical  Vertical Vertical
 X  C/L 

C/L 

C/L

   Door  Door  Door
 R  5/32 

.156  3.97

 K  4-1/8  4.125  104.78
 M 12-24 

— 

Vertical Centerline

of Door**

I N S T A L L A T I O N

Electric Strikes

4/7 Series

7105, 7305  

Aluminum & Wood Frames, 1-1/2” D

4105, 4305  

Aluminum & Wood Frames, 1-1/2” D

Any modular A41A43A71 or A73  

with B4705 faceplate

is47a

PCN16045

R07/17GR

MEASUREMENT

FRACTIONAL

INCHES

DECIMAL

INCHES

METRIC

mm

 A  1-1/8  1.125  28.58
 B  5-7/8  5.875  149.23
 C  3-3/8  3.375  85.73
 D  7/8 

.875  22.23

 E  1/4 

.250  6.35

  F 

1/8* 

.125*    3.18*

 G 1-11/16  1.687  42.86
   Vertical Vertical Vertical
 X  C/L 

C/L 

C/L

  

Door  Door  Door

 R  5/32  .156  3.97
 K  5-3/8  5.375  136.53
 M  12-24

 —  —

Vertical Centerline

of Door**

1.  Determine the vertical centerline of the door lock face and 

the horizontal centerline of the latch. 

IMPORTANT: When determining the horizontal centerline 

observe the following: 

FOR MORTISE LOCKS: Align the angled ramps of the lip 

bracket with the deadlock trigger of the mortise latch. 

FOR CYLINDRICAL LOCKS: Align the center of the latch with 

the center of the strike opening.**

2.  Transfer both the horizontal and vertical centerlines to the 

doorframe.**

3.  Prepare the doorframe for cutting as per the appropriate 

drawing.

4.  If required, install “no weld” mounting brackets as per the 

instructions on page 3.

5.  Attach the strike insert (coil unit or “motor”) to the 

lip bracket with the small machine screws provided.             

(M4 x 9.5mm)

6.  Attach the strike faceplate to the lip bracket with machine 

screws (M4 x 9.5mm) provided. (It may be desirable to leave 

these screws slightly loose to facilitate insertion into the 

doorframe.)

7.  Connect the incoming wiring from the power supply to the 

terminal screws on the strike insert. RCI door strikes are 

not polarity sensitive although be certain to observe proper 

polarity if a suppression diode is required for access control 

applications.

8.  Install the door strike in the doorframe using the screws 

provided.

Instructions

NOTE: Specifications subject to change without notice.
*  Dimension F is measured from face of mounting tab to face of frame.
** Dimension X on the drawing is determined by the vertical centerline of the door. If the latch incorporates a deadlocking pin additional steps will be 

necessary to ensure proper operation of the deadlocking pin. Measure the thickness of the deadlocking pin and add this thickness to Dimension X to 

relocate the vertical centerline an appropriate distance on the frame.

† 

For wood frame door installations, substitute #12 wood screws for dimension M.

       ©2010 rutherford controls int’l corP. www.rutherfordcontrols.com

usa: 2697 international Parkway, Pkwy 5, virginia beach, va 23452 • canada: 210 shearson crescent, cambridge, on  n1t 1j6  

 Phone • 1.800.265.6630 • 519.621.7651 • fax: 1.800.482.9795 • 519.621.7939 • e-mail: sales@rutherfordcontrols.com 

Summary of Contents for RCI 4 Series

Page 1: ... deadlock trigger of the mortise latch FOR CYLINDRICAL LOCKS Align the center of the latch with the center of the strike opening 2 Transfer both the horizontal and vertical centerlines to the doorframe 3 Prepare the doorframe for cutting as per the appropriate drawing 4 If required install no weld mounting brackets as per the instructions on page 3 5 Attach the strike insert coil unit or motor to ...

Page 2: ...42 86 Vertical Vertical Vertical X C L C L C L Door Door Door K 4 1 8 4 125 104 78 M 12 24 Vertical Centerline of Door Vertical Centerline of Door MEASUREMENT FRACTIONAL INCHES DECIMAL INCHES METRIC mm A 1 7 16 1 438 36 51 B 7 15 16 7 938 201 61 C 3 3 8 3 375 85 73 D 7 8 875 22 23 E 1 4 250 6 35 F 1 8 125 3 18 G 1 11 16 1 687 42 86 Vertical Vertical Vertical X C L C L C L Door Door Door R 5 32 156...

Page 3: ... frame for each mounting tab and countersink the frame 3 Remove the tabs from the faceplate and install in the frame using the 12 24 x 3 8 machine screws supplied Tabs are zinc plated and drilled and tapped for this purpose 4 Make final electrical connections per wiring instructions and mount strike to the tabs with the 12 24 x 3 8 machine screws 2017 Rutherford Controls Int l dormakaba Group www ...

Page 4: ...one a DC piezo buzzer can be installed Strike makes a buzzing sound Improper power supply Replace the power supply with a correct voltage DC power supply Strike has a burnt smell Improper voltage Confirm that you have the correct output voltage at the power supply Improper application A strike connected to an AC power supply will buzz unless a rectifier is installed Improper installation Confirm t...

Reviews: