Fig. 49
M5 x 20, A2-70
Spax 4.5 x 30
90° ±0.5°
Mount switch lock
12.
Function test: Operate the switch lock and check
whether the rod extends (Fig. 50).
Fig. 50
1.
2.
Perform a function test
13.
Operate the lock so that the espagnolette bolts
are retracted.
14.
Mount the fixed leaf and align it in the door frame
(Fig. 18).
15.
Mount the masking plate for the lower
espagnolette bolt in the floor (Fig. 51).
Fig. 51
optional
Mount masking plate
16.
Adjust the rod striking plate (Fig. 52).
Fig. 52
X
X
X
45°
Dimensions of the adjustments
17.
Mount the rod striking plate for the upper
espagnolette bolt in the door frame (Fig. 53).
Fig. 53
M5 x 20, A2-70
Spax 4.5 x 30
Mount rod striking plate
4.5.2 Adjust upper espagnolette bolt
1.
Disassemble the switch lock again.
2.
Operate the lock or push the upper espagnolette
bolt fully into the lock.
3.
Open the fixed leaf.
4.
Completely attach the adjusting tool with the
smooth side on the espagnolette bolt (Fig. 54).
20
SVI Lock
2019-12
dormakaba Mounting instructions
Mounting
WN 059741 45532