25
LEADING IN PRODUCTION EFFICIENCY
Operating Manual
© Dürr Systems AG
ED3K_Operating_Manual_Rev02LD_03Lug2020_EN. docx
Rev.02 – 03.07.2020
From the control panel, the color change valves
(2)
are managed through air pipes.
The products (catalyst, base paint or flushing product) pumped through the pipes, already come
under pressure to the valves
(2).
Under the control of pneumatic control valves, the products are pumped through the measuring
devices
(1)
, to the static mixer
(9).
The components (catalyst, paint base) are combined and premixed. The exact mixing takes place
in the static mixer
(9).
When a gun
(10)
(Airmix too) is connected to
Eco
Dose
3K the equipment is activated and controlled
with an air flowmeter, that is installed in the control panel.
A filter
(8)
controls and protects EcoDose3K from dirt particles coming from the compressed air
network.
In case of emergency, compressed air can be removed from
Eco
Dose
3K by closing the ball valve
(5)
.
With the system control panel pages, you can set-up and view all the data Necessary for the correct
functioning of the
Eco
Dose
3K
(see chapter 8).
With the remote panel
(optional)
with magnetic switches
(12)
the operator, in the cabin, can use
the main controls with a magnet.
(See chapter. 8.11).
The following parts are not included in
Eco
Dose
3K:
3.
Paint filter
4.
Pumping unit
6.
Air regulator
7.
Air manifold
8.
Air filter
10 Spray gun
11 EcoGun Cleaner M
Air pipes and product IN
Air pipes and product OUT