19
LEADING IN PRODUCTION EFFICIENCY
Operating Manual
© Dürr Systems AG
ED3K_Operating_Manual_Rev02LD_03Lug2020_EN. docx
Rev.02 – 03.07.2020
3.3.1 Special Safety Notes
Before performing maintenance and repairs you must make sure that
EcoDose 3K
does not
contain any residual pressure (air and product).
W A R N I N G
Danger due to spraying or splashing material!
Potential chemical burns of the skin due to material spurting from defective paint pipes
and color changers.
You must regularly check paint pipes and color changer and you must reduce residual
pressure before working on color valves and paint pipes.