Cafitesse 100 Next Generation
Functions - dosing system
August 2009
5C-7
Disassembly of the gear motor
Loosen the clamps at the CAM support (11) and
take off the CAM support together with the gear
motor (12) (fig. 6).
Pull off the counter bearing (13) and the light
barrier (14) (fig. 6).
Remove the C�M shaft (14) (fig. 7).
Pull off the submini switch (16) (fig. 7).
Undo the plug by pressing the snap-fits (17) (fig.
7).
Undo the 3 screws (19) on the CAM support (20)
and remove the gear motor (18) (fig. 7).
On assembly, note the following:
�ttend to the flat at the C�M for correct positio
-
ning.
Disassembly of the valve unit
Push the 2 snap-fits (22) together to release the
valve unit (21) and than take it out upwards (fig.
6).
Pull off the membranes (25), tappet rods (23)
and springs (24) come undone for the respective
valve (fig. 6).
On assembly, note the following:
Do not forget the springs when you reintegrate the
valves.
•
•
•
•
•
•
•
•
Fig. 6
Fig. 7
11
12
13
16
14
17
18
19
20
21
22
23
24
25
15
Summary of Contents for Cafitesse 110
Page 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Page 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Page 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Page 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Page 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Page 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Page 93: ......