Frame and Door Installation Manual 103 Series
TITLE:
99-18745 -I001
–
Frame and Door Installation Manual Pass-Thru Series
Manual
REV.
C
Page
3
of 21
2
17
TABLE OF CONTENTS
1. PRELIMINARY CONSIDERATIONS FOR DOOR AND FRAME SERVICING PROCEDURES ..........................4
1.1. Safety..........................................................................................................................................................4
1.2. Tools ...........................................................................................................................................................4
1.3. Tips .............................................................................................................................................................4
2.
NET OPENING AND FRAME INSTALLATION…………….................................................................................5
2.1. Net Opening and Frame Installation
……………………………………………………………………………..5
2.2. The following instructions will ensure proper frame installation
….............................................................5
2.3. Shimming Frame: .......................................................................................................................................5-6
2.4.
Sealing the frame……...…………………………………………………………………………………………...7-8
2.5. Frame Electrical Wiring Connections .........................................................................................................9
3. DOOR INSTALLATION ............................................................................................................................. ........ 10
3.1. To Install the Door Assembly.....................................................................................................................10
3.2. To Remove the Door Assembly.................................................................................................................10
3.3. To Reverse the Door Swing................................................................................................................... .... 11
3.3.1. Frame ........................................................................................................................................... 11
3.3.2. Door .............................................................................................................................................. 12
4. TORQUEMASTE
R™ AND SAG ADJUSTMENT............................................................................................... 15
5. SECTION 5 - COOLER/FREEZER* STORE CONDITION REQUIREMENTS ................................................. 16
Table 5.1: Operating conditions .................................................................................................................................... 16
O
PERATING
R
EQUIREMENTS AND
R
ECOMMENDATIONS FOR
O
PTIMAL
P
ERFORMANCE
..................................................................... 16
6. APPENDIX A
– PREVENTATIVE MAINTENANCE GUIDELINES.................................................................... 17
7. REVISION HISTORY PAGE
………………………………………………………………………………………………21