Frame and Door Installation Manual 103 Series
TITLE:
99-18745 -I001
–
Frame and Door Installation Manual Pass-Thru Series
Manual
REV.
C
Page
4
of 21
2
17
1.
PRELIMINARY CONSIDERATIONS FOR DOOR AND FRAME SERVICING
PROCEDURES
1.1. Safety
Proper safety equipment includes:
NOTE:
Turn off all electrical power prior to beginning work on the door or on any
electrical equipment. Use extra caution when working with or around the
door glass package.
NOTE:
Do Not use power tools for the following procedures.
1.2. Tools
- Tools required for this procedure include:
- #2 Phillips-head screwdriver - 4 to 6 Foot Level
- Flat-head screwdriver - NSF Approved Silicone Sealant
- Needle-nose pliers - Rubber or plastic mallet
-
7/16
” and 1/2” Hand Wrench - 5/32” Hex Key
-
Wire stripper and cutter - Soldering iron
-
Heat Gun - Razor Knife
- Plywood Shims - Measuring Tape
1.3.
Tips
•
Complete replacement of wire assemblies is recommended whenever
required. Splice wires only if necessary, using proper materials: such as
electrical tape, wire nuts, flux core solder and heat shrink.
•
Apply liquid soap to rail plastic covers and gaskets upon installation to
facilitate insertion into mounting grooves.
•
Keep doors and frames clean for product efficiency. This can also help
reduce energy consumption and potential health hazards.
•
Whenever binding gasket or plastic parts, use food grade silicone.
•
Always use the correct tool for the job to be performed. This ensures proper
installation and minimizes safety risks.
•
If there is any doubt about the work to be performed, consult with a certified
technician or Anthony representative.
•
Preventative maintenance is recommended to ensure product longevity.