15
24-2
24-6
24-3
24-3
24-7
24-1
24-8
24-3
24-6
24-5
24-4
GENERAL ASSEMBLY
H. OUTPUT PLANET SET ASSEMBLY
1. Insert the retaining ring (24-8) and the thrust
plate (24-7) into the carrier (24-1) along with
the gears (24-2), bearings (24-3), and thrust
washers (24-6).
2. Being careful to line up the thrust washers
(24-6) and bearings (24-3) with the planet
pins (24-5), press the pins into the carrier.
3. Replace the retaining rings (24-4).
If the pins are not lined up
properly, the thrust washer
can be shattered during the
pressing operation.
Summary of Contents for RUFNEK 100
Page 10: ...10 CLUTCH INSPECTION...
Page 27: ...27 VISCOSITY CHART...