Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
a
b
c
d
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
Curaflex Nova
®
Uno/M/Z
4e: Installation in combi-
nation with a
Quadro-Secura
®
ADS
4d: Installation in combi-
nation with a Quadro-
Secura
®
Quick/H
Remove the plug (b) from the modular sealing ring (a) and
fold the modular sealing ring insert around the cable/pipe
(c). Pull out as many layers as needed until the dividing
surfaces of the modular sealing ring insert touch but do not
overlap when closed around the cable/pipe.
The connection point of the modular sealing ring layers
may need to be cut with a blade to make it easier to
pull the layers out.
In the case of insulated media lines, remove the insulation in
the area of the sealing insert before installation.
3: Insert the modular sealing rings
2: Installing the gasket insert
Pull out the quick-release fastener and the opposite pin,
unfold the gasket insert and place it and place it around the
media line. Close the quick-release fastener. Reinsert the
pin.
Position the gasket insert in the sealing level of the wall. In
case of doubt in terms of where the sealing level is, clarify
the procedure with the planner or the wall manufacturer.
Position the gasket insert in the sealing level of the wall. In
case of doubt in terms of where the sealing level is, clarify
the procedure with the planner or the wall manufacturer.
Prior to installation in a Quadro-Secura
®
ADS the fixing tabs
must be screwed onto the frame ring using a conventional
screwdriver.
Push the gasket insert into the core bore/pipe sleeve until it
stops flush with the outer wall (water/pressure side).
4a: Installation with WR
concrete walls or pipe
sleeves
4b: Installation for double/
element walls - sealing
layer is the in-situ con-
crete (WR concrete)
Page 3
INSTALLATION INSTRUCTIONS
Curaflex Nova
®
Gasket inserts
www.doyma.com
Insulated pipes
Position the gasket insert to the inside of the basement.
4c: Installation for double/
element walls – sealing
level is in outer concrete
facade
Push the onion ring inserts into the sealing insert from the
side facing the water (!).