33
✓
unscrew the protective cap of the fitting charging that incorporates the
warning acoustic device as shown in Figure 12.
✓
Connect the cylinder to the EN 144-2 outlet and tighten by hand as shown
in Figure 13.
✓
Open the filling valve of the compressor very slowly and carefully to avoid
damaging of the non-return inner equipment.
✓
Charge the cylinder at an environment temperature of about 20°C up to its
maximum pressure (200 bar) as indicated by the pressure gauge of the
compressor and verify that this matches with the positioning of the needle
of the pressure gauge within the green sector of the dial.
Note
: this operation can cause a heating turning in an incomplete charging. It is
recommended to recharge at a speed of 27 bar/min.
✓
depressurize the hose and remove it from the charging connector of the
EEBD.
g.
Put the bottle to cool down until it reaches a room temperature. Check the
actual charging pressure, because the pressure could be lower than detected
during the charging, as a result of the cooling. If the pressure gauge shows a
lower pressure than necessary, complete the charge, repeat the cooling and
the control. Reposition the protection cap on the warning acoustic device as
shown in Figure 14, after making sure that there are no visible traces of dirt.
h.
After charging the cylinder, the device must be correctly repositioned inside
the bag. To do this, please look at the following instructions:
✓
Put the bottle into the bag, making sure that the pressure gauge is visible from
the transparent screen located at the bottom of the bag, as shown in figure 15
and in figure 16.
✓
Lock the cylinder with the Velcro straps in order to keep it in the position shown
in the previous paragraph.
✓
Put back the hose in the correct seat of the quick coupling in the pressure
reducer side by simply pushing it, as shown in Figure 17 and verify that it is
locked by slightly pulling it.
✓
Gently fold the cap as shown in Figures 18 to 21:
1.
Place the cap with the screen facing
upwards, fold up inward the side edges and
the upper one following the pleats of the
cap.
2.
Fold back the ends of the rectangle thus
obtained so as to take up less space in the
bag.
✓
Place the cap so folded inside the bag with the hose inserted between the
bottle and the cap in order to avoid problems during the closing and
Summary of Contents for 4342.8225
Page 2: ...2 ...
Page 39: ...39 11 Figure figures Fig 1 Fig 2 Fig 3 Fig 4 Fig 5 Fig 6 ...
Page 40: ...40 Fig 7 Fig 8 Fig 9 Fig 10 Fig 11 Fig 12 ...
Page 41: ...41 Fig 13 Fig 14 Fig 15 Fig 16 Fig 17 Fig 18 Fig 19 Fig 20 ...
Page 42: ...42 Fig 21 Fig 22 Fig 23 Fig 24 Fig 25 Fig 26 Fig 27 ...
Page 43: ...43 ...