DPtech DPX19000 Series Deep Service Switching Gateway
Installation Manual
Chapter 3 Installation Preparation
5
3.2.10 Space requirements
(1)
For moving the switch and servicing the modules, make sure the width of the aisle in the equipment
room is at least 0.8 m.
(
2)The equipment room is at least 3 m high
(3)
Reserve at least 0.8 m of clearance between the rack and walls or other devices.
3.3 Required tools
3.3.1 Accessories supplied by the switch
Cable wire
Grounding wrist
Console wire
Mount ear
Cabling rack
Blank panel
3.3.2 User-supplied tools and equipment
Straight screwdriver
Phillips screwdriver
Tray
Rack
Summary of Contents for DPX19000 Series
Page 67: ...Chapter 6 Troubleshooting 1 ...