DPtech DPX19000 Series Deep Service Switching Gateway
Installation Manual
Chapter 4 Device installation
5
4.4.2 Installation procedures
(1) Hold the two sides of the switch and steadily move the switch to the workbench.
(2) Lift the switch a little higher than the workbench and put on the workbench gently.
(3) Install the mounting brackets on the switch and fasten the screw.
4.5 Grounding the device
!
Warning
:
For the safety of operators and equipment (anti-thunder, tamper-proof), securely ground the switch.
Make sure the anti-interference between the switch chassis and the ground is less than 5 ohm.
DPX19000 grounding terminal locates at the lower right corner of rear panel with grounding
identification.
Figure 4-2 Grounding wire diagram
(1) Rear panel of the chassis
(2) Grounding hole screw
(3) Grounding identification
(4) Grounding hole
(5) OT terminal
(6) Grounding wire
To connect grounding wire:
(1)
Dismount grounding hole screw from the chassis
(2)
Attach the OT terminal on the grounding cable to the grounding screw on the chassis
Summary of Contents for DPX19000 Series
Page 67: ...Chapter 6 Troubleshooting 1 ...