background image

Caution 1: Do not over-tighten screws! Tighten the screw until it is fully seated in the frame and stop 

turning when the screw is tight. Forcing the screw beyond this point will strip the hole.

Caution 2: Beware of slipping with the screwdriver and punching a hole in the screen/clearside material. 

Tighten the screws firmly and deliberately, but do not rush yourself or press harder than necessary.

Success Hint: Open a screw bag only when it is required and store screws in a bowl. 

Assembly Note: Except for the Bottom Frame, the panel side with the sticker is the inside of the cage.

Assembly Note: Rattling inside a cage frame is normal and can be ignored. This is the pop rivet end.

Assembly Instructions: Large Clearside Enclosure 

Pre-Assembly: Attach Vine Holders, Dragon Ledges, and Misting Nozzle Hardware

Cage Panels:

(A) Back Panel

(B) Right Panel (with hinges attached)

(C) Bottom Frame

(D) Left Panel (with latch tabs attached)

(E) Top Panel

(F) Plastic Floor Panels (You will have 2 of these)

(G1) Upper Face Panel

(G2) Service Door

(H) Door

Dragon Ledges

Screw Pack

(Dragon Ledges)

Vine Holders

Screw Pack

(Cage)

Packing List : 

Carefully unpack the box and find each item. 

Tools Needed for Assembly:

Phillips Head Screwdriver

Scissors (to unwrap parts)

Bowl (to hold screws)

A) Install Dragon Ledges: Please reference Dragon Ledge Install Instructions

B) Misting Nozzle Hardware: Misting nozzle mounting hardware must be pur-

chased from the misting nozzle manufacturer. If you are using a misting system 

and are using a support wedge please install the hardware at this time. The wedge 

may cover one of the Vine Holder pre-drilled holes 

C) Attach Vine Holders: These attach to the top panel and will provide a conve-

nient anchor to loop artificial vines.  Find the two pre-drilled holes on the Top 

Panel (E) and attach the vine holders using the screws included in the vine holder 

bag. If one of the pre-drilled holes is covered by a misting nozzle mounting wedge 

then you have to option of leaving that vine holder off or placing the vine holder 

in another location and firmly screwing it in place using the self-tapping screw.

D) Remove Stickers: If you desire to remove the frame stickers, carefully pry as 

much off as possible and use Goo Gone or WD-40 to rub off the adhesive.

Dragon Ledges

Misting Wedge

Vine Holders

1) Construct cage core with 

Back Panel (A), Top Panel (E), 

and Bottom Frame (C). Use 

3/4” screws from cage screw 

bag. Bottom Frame sticker is 

on outside. Other panels are in-

stalled with stickers on inside.

2) Add Side Panels (B) and (D) 

with 3/4” screws. Stickers are 

on the inside top of the panel. 

Attach to Top Panel (E) first 

to avoid slipping and possible 

screen damage to Top Panel.

3) Complete Front by first installing the Service Door 

(G2) with two 3/4” screws from the sides. Then install the 

Upper Face Panel (G1). Finally, lay the door in and use 

four flathead 1/4” screws to attach to hinges.

4) Slide in Floor Panel (F)
Your Large Clearside Enclosure is complete!

042317

15 x

 1”

20 x

 1/2”

26 x

 3/4”

4 x

 1/4”

Reviews: