Water heating by electric energy 

 

After the heater is connected to electric network, the heating element starts heating water. The element 

 

is  turned  on  and  off  by  a  thermostat.  After  reaching  the  temperature  set,  the  thermostat  switches  off 

 

the electric circuit and discontinues water heating. The control light signals if the element is in operation 
(light is on) or if it is off (the light goes out). In case of longer operation without using the heated volume,

 

the thermostat has to be set to position 5°C to 8°C (set the “snowflake” symbol on the thermostat selector) 
to  avoid  its  freezing,  or  electricity  supply  to  the  heater  has  to  be  switched  off.  In  combined  versions, 

 

the stop valve on the inlet to the exchanger has to be closed at the inlet to the heat exchanger while which 
prevents heating the water in the hot water heating system.

 

 

b)

 

Service water heating via thermal energy through heat exchanger

 

 

 

Closing valves of the heat exchanger must be opened which ensures heating water flow from the hot water 
heating system. Together with the closing valve, it is recommended to install an air outlet valve at the inlet 
to the heat exchanger in order to bleed the heat exchanger as needed, in particular before the beginning 

 

of  the  heating  season  (Figure  9).  The  time  it  takes  to  heat  up  using  the  heat  exchanger  depends

 

on  the  temperature  and  flow  of  water  in  the  hot  water  heating  system.

 

A  combined  heater  is  made

 

in universal design 

depending on the need of connecting the closing valves to the heating element either 

from the right, or from the left.

 

 
 

2.6

 

FIRST COMMISSIONING 

After connecting the  heater  to  the  water  supply,  the  hot  water  heating  system,  the  electric 
network, and after testing its safety valve (based on the valve manual attached), the heater may 
be put into operation. Before opening the power supply, the tank must be filled with water.

 

The process of first heating must be executed by licensed professional who has to check it. Both 
the hot water outlet pipe and safety armature parts may be hot.

 

 

 

Summary of Contents for OKC 100 NTR/HV

Page 1: ...ter heaters OKC 80 OKC 160 OKC 100 OKC 200 OKC 125 Hot water tanks OKC 100 1 m2 OKC 160 1 m2 OKC 125 1 m2 OKC 200 1 m2 Družstevní závody Dražice strojírna s r o Works Cooperative Dražice Machine Plant Ltd Dražice 69 294 71 Benátky nad Jizerou tel 420 326 370 911 fax 420 326 370 980 e mail export dzd cz ...

Page 2: ...NSTALLATION 15 2 4 1 GENERAL INFORMATION FOR ELECTRICAL INSTALLATION 15 2 5 OPERATION 16 2 6 FIRST COMMISSIONING 16 2 7 PUTTING OUT OF SERVICE DISCHARGE 17 2 8 INSPECTION MAINTENANCE CARE FOR THE APPLIANCE 18 2 9 MOST FREQUENT FUNCTION FAILURES AND THEIR CAUSES 18 3 OPERATION OF THERMOSTAT 20 3 1 SERVICING 20 3 1 1 OPERATING DEVICES OF THE HEATER 20 3 1 2 TEMPERATURE SETTING 21 4 IMPORTANT NOTICES...

Page 3: ...ponsible person or unless properly instructed by such responsible person The manufacturer reserves the right for engineering modification of the product The product is designed for permanent contact with drinkable water It is recommended to use the product in indoor environment with air temperatures from 2 C to 45 C and a relative humidity up to 80 Product s reliability and safety is proven by tes...

Page 4: ...R CUSTOMERS 1 2 1 HOT WATER CONSUMPTION Consumption of hot water in households depends on the number of people amount of sanitary equipment length diameter and insulation of piping in the flat or on individual habits of users The cheapest option of water heating comes at the time when the electricity rate is reduced Find out in what time intervals your electricity supplier provides reduced tariff ...

Page 5: ...de of the tank is enamelled A flange is welded onto the bottom of the tank with a flange lid screwed to it A sealing ring is inserted between the flange lid and the flange Thermowells for placing a heating element and sensors of regulation thermostat and safety fuse are located in the flange lid An anode rod is mounted onto the M8 nut The water reservoir is insulated by means of polyurethane foam ...

Page 6: ... 6 OKC 80 OKC 100 OKC 125 Upper suspension detent support rectifying screw Figure 1 OKC 160 Upper suspension lower suspension Figure 2 3 4 outer 3 4 outer ...

Page 7: ... 7 OKC 200 Upper suspension lower suspension Figure 3 OKC 100 1m2 OKC 125 1m2 Upper suspension detent support rectifying screw Figure 4 3 4 outer 3 4 outer 1 outer 3 4 inner ...

Page 8: ... 8 OKC 160 1m2 Upper suspension lower suspension Figure 5 OKC 200 1m2 Upper suspension lower suspension Figure 6 3 4 outer 1 outer 3 4 inner 3 4 outer 1 outer 3 4 inner ...

Page 9: ...m2 OKC 160 OKC 160 1m2 OKC 200 OKC 200 1m2 A 757 902 1067 1255 1290 B 612 612 612 612 655 C 70 70 70 70 70 D 524 524 524 524 584 E 605 755 622 755 789 995 991 790 784 F 460 610 478 610 645 720 815 600 G 550 550 830 889 H 142 137 270 302 268 250 254 490 496 I 211 211 263 211 263 211 263 239 J 501 651 703 651 703 651 703 679 K 172 172 172 172 172 R 450 450 450 450 450 ...

Page 10: ...OM 10 C TO 60 C hrs 2 0 2 5 3 2 3 9 5 2 TYPE OKC 80 OKC 100 OKC 125 OKC 160 OKC 200 EXCHANGER HEAT TRANSFER SURFACE m2 0 41 0 68 0 68 0 68 0 68 HEATING TIME BY EXCHANGER FROM 10 C TO 60 C AT FLOW 720 l h min 32 23 28 35 45 RATED THERMAL OUTPUT AT HEATING WATER TEMPERATURE 80 C AND FLOW 310 l h W 6000 9000 9000 9000 9000 HEATING TIME BY EXCHANGER FROM 10 C TO 60 C AT FLOW 310 l h min 50 48 55 67 86...

Page 11: ...mon decalcifying device was installed with the appliance or the thermostat to be set to the minimum operation temperature of 60 C setting to position ECO or OPTIMUM Figure 15 Figure 16 For proper operation drinkable water of adequate quality shall be used To avoid potential sediments we recommend that the device was installed together with a water filter 2 2 WALL MOUNTING Prior to the mounting che...

Page 12: ...om the bottom edge of the heater has to be available under the heater When mounted directly under the ceiling the distance from the ceiling has to be 50 mm at least Free space of up to 500 mm from the bottom edge of the heater has to be available under the heater If the water heater is mounted in enclosed areas inter ceilings built in structures and recesses ensure sufficient access to service fit...

Page 13: ...ting it into operation It is checked by manual moving of the membrane from the seat turning the make and break device button always in the direction of the arrow After being turned the button must click back into a notch Proper function of the make and break device results in water draining through the safety valve outlet pipe In common operation such a check needs to be implemented at least once ...

Page 14: ...ommended to install stop valves on the heating water inlet and outlet for possible dismantling of the heater The valves have to be as close to the heater as possible to avoid higher thermal losses Figure 9 Figure 10 ...

Page 15: ...rised to perform that activity Expert connection must be confirmed on the warranty certificate The heater is connected to the 230 V 50 Hz electricity supply using a fixed moving conductor with a switch that turns off all network poles and the circuit breaker protector In the OKC 80 125 and OKC 100 125 1m2 heaters after wall mounting and adjusting the distance from the wall by M8x80 rectifying scre...

Page 16: ...eat exchanger Closing valves of the heat exchanger must be opened which ensures heating water flow from the hot water heating system Together with the closing valve it is recommended to install an air outlet valve at the inlet to the heat exchanger in order to bleed the heat exchanger as needed in particular before the beginning of the heating season Figure 9 The time it takes to heat up using the...

Page 17: ...let valves or de aerate the exchanger 8 When commencing operation flush the heater until the cloudiness in the water is gone 9 Make sure to fill in properly the warranty certificate 2 7 PUTTING OUT OF SERVICE DISCHARGE If the hot water heater is put out of service for a longer time or if it is not going to be used it has to be drained and disconnected from the electric supply network on all poles ...

Page 18: ...amel which must not get in contact with the scale removing agent do not work with a lime pump Remove the lime layer with a timber and suck it off or wipe it off with a clout After that the appliance must be rinsed thoroughly and the heating process is checked the same as during the initial putting in operation Do not use any abrasive cleaning agents such as liquid sand chemicals acid alkaline or d...

Page 19: ... enough Light on failure of one of the coils in the element contains 2 Temperature of water is not corresponding with the set value Defective thermostat Water is constantly dripping off the safety valve Light off high input pressure defective safety valve Table 5 Do not attempt to repair the failure yourselves Seek either expert or service help It does not take much for an expert to remove the def...

Page 20: ...nstallation cover for heaters OKC 80 OKC 100 OKC 125 OKC 160 OKC 100 1m2 OKC 125 1m2 OKC 160 1m2 Figure 14 Thermostat and no other part of the control panel is not a bearing part which can be used for any handling with the heater Tipping plastic guard Electric circuit closing indicator lamp Thermostat knob Thermostat knob Electric circuit closing indicator lamp ...

Page 21: ...use without blocking the daily rate we do not recommend the temperature to be set above 60 C Select the ECO or OPTIMUM symbol as the maximum Figure 15 Figure 16 Lower limit of temp scope around 5 C Fixed point on the control panel Anti freezing temperature about 8 C Upper temperature range limit about 74 C Ideal temperature about 60 C Fixed mark on the control panel Upper temperature range limit a...

Page 22: ... heater exceeds 90 C As an exception the thermal fuse may also switch off due to water overheating caused by overheating the hot water heating system boiler We recommend you operate the heater with one type of energy If you don t use the heater hot water tank for longer than 24 hours or if the facility with heater is unattended close the cold water inlet to the heater The heater hot water tank sha...

Page 23: ...sposal place determined by the town When the operation terminates disassemble and transport the discarded and unserviceable heater to a waste recycling centre collecting yard or contact the manufacturer 5 PRODUCT ACCESSORIES The product is supplied with a safety valve 2 4 fastening screws M 12x30 2 4 washers Ø 13 13 hinges consoles a thermometer rectifying spacer screw M8 fan shaped washer Ø 8 4 2...

Reviews: