background image

 

 

8. 

SPARE PARTS 

 

- Mg anode – 800 l; 
- Thermometer; 
When ordering spare parts, give part name, type, and type number from the heater label. 

 
 

9. 

HEATER CLEANING AND ANODE ROD EXCHANGE 

 

Repetitive  water  heating  causes  limestone  sediment  on  both  the  enamelled  tank  walls  and  chiefly  the  flange  lid.  The 
sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed.

 

After two years of operation, it is recommended to check, and possibly clean, the tank of limestone, as well as to 
check,  and  possibly  exchange,  the anode  rod.

  The  anode  life  is  theoretically  calculated  for  two  years  of operation; 

however, it changes with water hardness and chemical composition in the place of use. Based on such an inspection, the 
next term of anode rod exchange may be determined. Have the company in charge of service affairs clean and exchange 
the anode. When draining water from the heater, the combination faucet valve for hot water must be open, preventing 
occurrence of under-pressure in the heater tank which would stop the water from draining.

 

 
 

10. 

INSTALLATION REGULATIONS 

 
Regulations and instructions that must be obeyed during heater assembly: 

a)

 

to the heating system 

ČSN 06 0310 – Thermal systems in buildings – Designing and Installation 
ČSN 06 0830 – Thermal systems in buildings – Protecting devices 

b)

 

to the electrical network 

ČSN 33 2180 - Connecting of electric devices and appliances 
ČSN  33  2000-4-41  -  Low  voltage  electric  installations  Protective  measures  to  ensure  safety  –  Protection  against 
electric shock

 

ČSN  33  2000-7-701  -  Low  voltage  electric  installations  Single-purpose  devices  and  devices  in  special  premises  - 
Premises with tub or shower to hot service water heating system

 

c)

 

to the hot water heating system  

ČSN 06 0320 - Thermal systems in buildings - Hot water preparation – Design and Project Engineering 
ČSN 06 0830 – Thermal systems in buildings – Protecting devices

 

ČSN 73 6660 – Internal water mains 
ČSN 07 7401 - Water and steam for thermal energy equipments with working steam pressure up to 8 MPa 

ČSN 06 1010 - Tank water heaters with water and steam heating; and combined with electric heating  

Technical requirements. Testing. 

 

ČSN 75 5455 – Calculation of water installations inside buildings

 

 

ČSN EN 12897 – Water supply – Indirectly heated closed tank-type water heaters

 

 

Both electric and water installation must follow and meet requirements and regulations relevant in the country of use.

 

 
Notice: 

To prevent the occurrence of bacteria (e.g. Legionella pneumophila) within stack heating it is recommended, if 

absolutely  necessary,  to  increase  the  temperature  of  hot  service  water  (HSW)  periodically  for  a  transitional  period  of 
time to at least 70°C. It is also possible to make use of another way of disinfecting HSW.

 

 
 

11. 

CONNECTING A HEATER TO A HEATING SYSTEM 

 
The  heater  is  placed  on  the  ground,  next  to  the  heating  source,  or  in  its  vicinity.  The  heating  circuit  is  connected  to 
marked inputs and outputs of the heater exchanger; the deaerating valve is mounted in the highest place. It is necessary 
to  install  a  filter  into  the  circuit  in  order  to  protect  the  pumps,  the  three-way  valve,  and  backflow  flaps,  and  the 
exchanger  from  sedimentation.  It  is  recommended  to  flush  the  heating  circuit  before  the  assembly.  All  wiring 
connections must be properly insulated from heat. 

If the system will work with priority heating of hot water using a three-way 

valve, always follow the installation instructions of the three-way valve’s manufacturer. 

Summary of Contents for OKC 1500 NTR/1Mpa

Page 1: ...Pa OKC 800 NTRR 1 MPa OKC 1500 NTR 1 MPa OKC 1500 NTRR 1 MPa OKC 2000 NTR 1 MPa OKC 2000 NTRR 1 MPa Družstevní závody Dražice strojírna s r o Works Cooperative Dražice Machine Plant Ltd Dražice 69 29471 Benátky nad Jizerou Tel 326 370911 fax 326 370980 www dzd cz dzd dzd cz ...

Page 2: ...junction with another source of heating water most often a gas boiler The NTRR types combine two sources of heating water gas boiler a solar system or a heat pump Their nominal performance provides sufficient amount of hot water for large flat units premises restaurants and similar establishments In case of increased hot water consumption these tanks heat water continuously operating similarly to ...

Page 3: ...in case of a combined heater We recommend you operate the heater with one type of energy In case a solar system is connected to the bottom exchanger it is necessary to connect a TJ 6 4 line element in the coupling above the heater for potential additional heating 4 PUTTING THE HEATER INTO OPERATION After connecting a heater to the water main the hot water heating system the electric network and af...

Page 4: ...erature C 110 110 110 Max hot water temperature C 95 95 95 Heating surface of the bottom top exchanger m 2 2 76 1 2 3 5 1 75 4 2 0 Bottom top exchanger performance for temperature drop 80 60 C kW 36 4 19 2 38 9 26 4 71 5 41 9 Hot water1 permanent performance bottom top exchanger l hr 627 330 670 454 761 503 Heating time by bottom top exchanger for temperature drop 80 60 C min 70 60 128 94 155 108 ...

Page 5: ...ast 20 higher than the maximum pressure in the water main If the water main pressure exceeds such value a reduction valve must be added to the system No stop valves can be put between the heater and the safety valve During the assembly follow the guide provided by the safety equipment manufacturer Before putting the safety valve into operation it always needs to be checked by manual removal of the...

Page 6: ...emises Premises with tub or shower to hot service water heating system c to the hot water heating system ČSN 06 0320 Thermal systems in buildings Hot water preparation Design and Project Engineering ČSN 06 0830 Thermal systems in buildings Protecting devices ČSN 73 6660 Internal water mains ČSN 07 7401 Water and steam for thermal energy equipments with working steam pressure up to 8 MPa ČSN 06 101...

Page 7: ...eated by a gas boiler and solar collectors controlled by a three way valve An example of a group heater connection for steady hot water consumption from all tanks using Tichelmann s method OV Heating water TUV Hot service water SV Cold water 1 Return valve C Circulation 2 Pump ...

Page 8: ... time by exchanger for temperature drop 80 60 C min 262 155 86 73 Performance for temperature drop 80 60 C kW 28 9 44 2 71 5 81 4 Permanent performance l hr 498 761 1230 1400 2000 NTRR top exchanger surface 2 00 m2 Heating time by exchanger for temperature drop 80 60 C min 160 108 70 63 Performance for temperature drop 80 60 C kW 21 2 29 2 41 9 46 3 Permanent performance l hr 364 503 721 797 NL Po...

Page 9: ...eater was delivered The service fee was paid pursuant to Act No 477 2001 Coll as amended at EKO KOM a s The client number of the company is F06020274 Take the water boiler packages to a waste disposal place determined by the town When the operation terminates disassemble and transport the discarded and unserviceable heater to a waste recycling centre collecting yard or contact the manufacturer 1 1...

Page 10: ...ection of the arrows to put the two insulation sides together so that see Fig 1 the openings in the insulation fit the boiler inlets and outlets It must be secured that both halves of the closure are not further than 20 mm apart before closing see fig 2 No foam shall get into the zip fastener on closing After the insulation coat is properly mounted and the closure closed insert the top lid made of...

Page 11: ...11 15 CONSTRUCTION HEATER PARAMETERS OKC 800 NTR 0 6 MPa OKC 800 NTRR 0 6 MPa ...

Page 12: ...B 442 452 C 1117 1152 D 1100 1200 d 1000 1100 E 1217 1252 F 1825 1997 G 437 447 H 1167 1202 I 1354 1472 J 1494 1612 K 1825 1997 OKC 1500 NTRR 1 MPa OKC 2000 NTRR 1 MPa A 2240 2430 B 442 452 C 1067 1090 D 1200 1300 d 1000 1100 E 1217 1252 F 1342 1393 G 1722 1713 H 1825 1997 I 437 447 J 1167 1202 K 1354 1472 L 1494 1612 M 1825 1997 ...

Reviews: