© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
Preparation
To prevent serious injury, do not lean against the installed glass.
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with
your packing slip. After opening all boxes and packages read this introduction carefully. Check that
all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of
Shower Door Components”. If the unit has been damaged, has a finishing defect, or has missing parts, please
contact our customer support department within
3 business days
of the delivery date.
Please note that
DreamLine
®
will not replace any damaged products or missing parts free of charge after 3 business days
or if the product has been installed.
Contact DreamLine
®
if you have any questions, and please provide an
order number, job name or other proof of purchase to help us identify your original order.
2.
Note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is not
responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing and
drainage before installing the shower. Use a competent and licensed (if required by local code) plumber for all
plumbing installation
4. Prior to beginning the installation, the surfaces are leveled and solid and will be able to support the total
weight of the unit. Also make sure the walls are at right angles. Irregular installation surface level, radius corners
or improper angle of side walls will result in serious problems for your installation. Please, note that some
adjustments and drilling might be necessary during the installation process.
5. Protect all primary surfaces of the product during installation. Never set your glass down directly onto a tile
floor. Leave corner protectors in place until necessary to remove them. Always use a piece of wood or cardboard
to protect the bottom edge and corners of the glass prior to and during installation.
6.
This unit must be installed upon a finished threshold and against finished walls.
7.
The inline panel and the return panel for this model will allow for up to 1/4“ of out-of-plumb
adjustment within the U-Channel.
Use a level to verify that finished wall conditions are within this
tolerance before installation.
8.
This model requires that you drill into the threshold for proper installation.
9.
This model requires a minimum
2-1/4”
of flat threshold space for installation.
10.
Installation of the Guide Rail brackets into a stud or 2 x 6 wood reinforcement is strongly
recommended.
11.
Professional installation required.
NOTE: DO NOT
attach the handle to the door glass until instructed.
DO NOT
use the handle to lift the glass during installation. This may result in damage
to the glass and/or serious injury. Always use an assistant and/or a professional grade
glass suction cup when handling heavy glass panels.
5
ENIGMA AIR ENCLOSURE Shower Enclosure manual Ver 1 Rev 4 062019
©2019 DreamLine. All Rights Reserved
NOTE:
When constructing or installing a shower base, consider how
the thickness of
the wall treatment (wallboard, tile, etc.) will affect where the shower enclosure
will sit on the threshold.
Compare the overall outside dimensions of the shower enclosure model size as shown
on the “Shower Enclosure Plan” with the finished threshold before proceeding with the
installation.
!
!