© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
LINEA with Towel Bar Assembly Installation
22
LINEA Shower Panel Installation Manual Ver 2 082021
©2021 Dr
eamLine® A
ll R
igh
ts R
eser
ved
.
The surfaces need to be clean
and free of debris before
applying silicone
!
Allow 24 hours for
the silicone to cure
before using the
shower!
NOTE
This model is fully reversible.
The installation is shown
with the right wall single panel orientation in Fig.
15a.
For installation of the left wall single panel, simply
reverse the orientation of your installation and begin on
the opposite wall.
Fig 15a
Fig 15b
The installation of this panel is identical to the single
panel installation.
•
Follow Steps 1 through 13
to install the single
panel with
Towel Bar Assembly (#05)
.
• Install the
Towel Bar Assembly (#05)
, ensuring all
vinyl gaskets are present to prevent glass-to-metal
contact, as shown in
Fig. 15b
.
• After the installation of the towel bar, apply a 100%
mildew-resistant silicone along the
Vertical and
Bottom U-Channel(s) (#09/29)
where it meets the
wall and threshold from inside of the shower, as
shown in
Fig. 15c
. Apply silicone along the outside
perimeter, if desired.
right wall single panel installation shown
R
wall
outside
LIFT
DO NOT attempt to lift the glass
with the Towel Bar Assembly (#05).
This could result in damage to the
glass and/or serious personal injury.
Always use an assistant or a
professional-grade glass suction cup
when handling heavy glass.
When installing the
Towel Bar Assembly
(#05)
,
confirm that the
assembly is facing outward.
NOTE
Fig 15c
24
Hours
Install the surface with the ClearMax
TM
label towards the inside of the shower.
15