© DreamLine
®
All Rights Reserved
© DreamLine
®
All Rights Reserved
Tools Needed
Parts Needed
Tools Needed
Parts Needed
23
29
x4
x1
34
x1
29
LINEA Shower Panel Installation Manual Ver 2 082021
©2021 Dr
eamLine® A
ll R
igh
ts R
eser
ved
.
1
2
3
1
2
If necessary, add additional
PVC Glass Spacers 0.5mm (#34)
into the
Bottom U-Channel (#29)
to level the panel glass. Do Not Exceed 1/4” (6mm) of vertical adjustment. Return Panel Glass must
match the installed other panel glass at the standard model height of 72” (1829mm).
TIP
11
x1
!
After applying silicone into the
bottom u-channel, insert the
cut pieces of the
PVC Spacers
0.5mm (#34)
into the
Bottom
U-Channel (#29)
to prevent
glass-to-metal contact.
1
2
3
4
5
6
7
NOTE
NOTE
Use at least 3 screws to
attach the
Bottom
U-Channel (#29)
for
panels over 14” (355mm).
Fig 26
Fig 27
For drilling
instructions into
threshold materials,
refer to
Step 24
.
26
27