background image

© DreamLine

 All Rights Reserved

© DreamLine

 All Rights Reserved

©2018 DreamLine. All Rights Reserved

8

QUATRA PLUS Shower Enclosure Manual Ver 1  10/2018

!

2

3

Fig 4

Fig 3

inside

2

2

3

3

Ø5/16"

Ø5/16"

inside

Wall

outside

Wall

4

4

1

1

1

4

outside

Wall

Note:

 Install the panel glass with bottom 

bracket holes at the bottom.

3.

 

Mark the drilling holes on the wall through the predrilled holes in the 

Stainless Steel

 

U-Channels 

(#11). 

Drill the holes in the wall using a 

Ø5/16”(8mm)

 drill bit and insert the 

5/16”

 

Wall Anchors 

(#07)

. Run a bead of Waterproof silicone along the back of the 

Stainless Steel

 

U-Channels (#11).

 

Fasten the 

Stainless Steel

 

U-Channels (#11) 

to the walls using the 

Pan Head Screw ST4.2×40 (#08)

 

(Fig 3)

4.

 

Add silicone into the installed 

Stainless Steel

 

U-Channels (#11) 

before installing the panel glass 

into the channels. If necessary, tap with a rubber mallet and a block of wood.  

(Fig 4 and Fig 5) 

Summary of Contents for QUATRA PLUS Series

Page 1: ...the right to alter modify or redesign products at any time without prior notice for the purpose of product improvement and customer experience Please refer to the model s web page on DreamLine com fo...

Page 2: ...rds the inside of the shower Please note that depending on the model the glass may be coated on either one or both surfaces For best results squeegee the glass after each use and dry with a soft cloth...

Page 3: ...east 24 hours to allow the silicone to fully cure in the U Channel holding the hinge panel glass The hinge panel glass for this model should not be adjusted more than 1 4 within the U Channel for an o...

Page 4: ...17 11 12 NOTE This door is reversible for left or right hand return panel installation The right hand return panel installation is shown as an example throughout this manual For the left hand return p...

Page 5: ...Rights Reserved 2 QUATRA PLUS Shower Enclosure Manual Ver 1 10 2018 58 3 8 34 1 8 SHEN 1434580 W2 W1 46 3 8 32 1 8 SHEN 1432460 W2 W1 46 3 8 34 1 8 SHEN 1434460 W2 W1 52 3 8 34 1 8 SHEN 1434520 W2 W1...

Page 6: ...is unit is going to be installed in a new construction please install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plum...

Page 7: ...n to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement The shipping boxes may contain extra parts not used in your model configuration NOTE Retain thes...

Page 8: ...hts Reserved DreamLine All Rights Reserved Detailed Diagram of Shower Door Components 2018 DreamLine All Rights Reserved 5 QUATRA PLUS Shower Enclosure Manual Ver 1 10 2018 11 11 7 10 12 13 14 15 16 1...

Page 9: ...2 03 04 05 06 07 08 09 10 11 12 13 14 15 17 16 Hinge Panel Glass Door Glass 1 Return Panel Glass 1 Right Hand L Bar 1 Handle 1 Hinge 2 5 16 Wall Anchor 1 set 8 ST4 2 x 40 Pan Head Screw 8 Pan Head Scr...

Page 10: ...g at the bottom measure from the finished back corner of the opening to the dimensions shown in TABLE A Draw a plumb line up the wall according to the Glass Box Code for the Shower Enclosure model siz...

Page 11: ...he wall through the predrilled holes in the Stainless Steel U Channels 11 Drill the holes in the wall using a 5 16 8mm drill bit and insert the 5 16 Wall Anchors 07 Run a bead of Waterproof silicone a...

Page 12: ...1 10 2018 Fig 5 24 1 8 24 1 8 Hinge Panel Glass Return Panel Glass 5 Set the Hinge Panel Glass 01 onto the threshold and into the Stainless Steel U Channel 11 Do the same for the Return Panel Glass 0...

Page 13: ...nual Ver 1 10 2018 DESCRIPTION DESCRIPTION Qty Qty Item Item 15 1 PVC Spacer 1 pc 15 6 Wall Plate 1 pc 15 2 Rubber Tip Set Screw 2 pcs 15 7 Truss Head Screw ST 4 2 x 40 2 pcs 15 L Bar left hand shown...

Page 14: ...nel Glass 01 as shown and mark its position on the wall Remove the Wall Plate 15 6 from the Left Hand L Bar 15 Hold the Wall Plate 15 6 to the marks on the wall Check for level and mark the holes for...

Page 15: ...Vinyl Seal 12 to the edge of the return panel glass to protect the edge during the installation of the door glass Fig 8 10 9 0 1 16 2mm 11 8 Adjust the Hinge Panel Glass 01 to plumb and tighten the sc...

Page 16: ...Page 18 for instructions regarding the adjustment features of these hinges hinge panel door Use caution when installing the door glass DO NOT make contact with the edge of the return panel glass TIP S...

Page 17: ...de glass suction cup when handling heavy glass 1 2 return panel door inside return panel Fig 11 Fig 12 Fig 10 Remove the shims after the door glass is secured to the hinges NOTE It is recommended to l...

Page 18: ...nt and notch approximately 3 8 off of the inner side of the Sweep Vinyl 14 as shown in Fig 13 2 Press the Sweep Vinyl 14 tightly onto the bottom edge of the Door Glass 02 Fig 13 14 Take three measurem...

Page 19: ...bottom of both lites of the Stationary Glass using the gaskets to prevent glass to metal contact Mark the Shower base through the holes in the flange of the Bottom brackets 16 Remove the bracket and...

Page 20: ...0 2018 Fig 17 Allow 24 hours for the silicone to cure before using the shower NOTE The surfaces need to be clean and free of debris before applying silicone 24 Hours 17 Apply a good quality mildew res...

Page 21: ...DreamLine All Rights Reserved DreamLine All Rights Reserved 2018 DreamLine All Rights Reserved 18 QUATRA PLUS Shower Enclosure Manual Ver 1 10 2018...

Page 22: ...y used rinse the surface as soon as possible to prevent damage to the finish peeling or corrosion After cleaning the polished finishes rinse thoroughly and wipe dry with a soft cloth Clean stainless s...

Page 23: ...All Rights Reserved TEL 866 731 2244 FAX 866 857 3638 DREAMLINE COM For more information on DreamLine Shower Doors and Enclosures please visit DreamLine com 2018 DreamLine All Rights Reserved QUATRA P...

Reviews: