Rev. 1.2.
3
Preparation
1. After opening the boxes, read this introduction carefully, check all the packed parts are
complete by cross checking all the components against the “Detailed Diagram of
Shower Cabin Components”. Examine for shipping damage. If the unit has been
damaged or has a finishing defect, please contact your local distributor within 3
business days. Please note that
Bath Authority
TM
/ DreamLine
TM
will not replace
any damaged product or parts free of charge after 3 business days or if the
product has been installed.
Contact your distributor or DreamLine if you have any
questions.
2.
Please note that you should consult your local building codes on questions on
installation compliance standards. Building and plumbing codes vary by
location, and DreamLine is not responsible for code compliance standards for
your project.
3. Install all of the required plumbing and drainage before securing the shower.
Use a
competent and licensed (if required by local code) plumber for all plumbing
installation and licensed electrician for all electric installation.
4. Please insure that prior to the installation the floor is leveled and solid and will be able
to support the total weight of the unit and its occupant. Also make sure the walls are at
right angles. While some adjustment in leveling of the tray is possible, irregular floor
level or improper angle of side walls will result in serious problems for your installation.
Please, note that there are some adjustments and drilling might be necessary during
the installation process.
.
Tools Required
Caulk
Tape
Measure
Level
Pencil
Drill bit
(D=3mm)
Caulk
Gun
Electric
Drill
Phillips
Screwdriver
Wrench