© 2002-2006 DreamLine™. All Rights Reserved
Victoria/DLG-65
1
Victoria / DLG-65
Shower Cabin Installation and User’s guide
I. Mounting Preparation
1.
After opening the case, read this introduction carefully, check all the packed parts, and examine the shower cabin for
shipping damage. If the unit has been damaged or has a finishing defect, please contact your local distributor within 3
business days. Please note that DreamLine Guarantee will not cover shipping damage or such finishing defects once the unit
has been installed. Your distributor’s responsibility for damage in transit is limited after the shower package has been
transferred to the transportation company, so you may have to contact the transportation company directly to report damage.
Contact your distributor or DreamLine if you have any questions.
2.
You should make sure that the floor is leveled and solid and will be able to support the total weight of the unit and its
occupant. You should also consult your local building codes on questions on installation compliance standards.
3.
Install all of the required plumbing and drainage before securing the shower. Use a competent and licensed (if required by
local code) plumber for all plumbing installation.
4.
Please insure that prior to the installation the floor is leveled and the walls are at right angles. While some adjustment in
leveling of the tray is possible, irregular floor level or improper angle of side walls will result in serious problems for your
installation. Please, note that there are some adjustments and drilling might be necessary during the installation process.
Please, note that there are some adjustments and drilling might be necessary during the installation process.
5.
Necessary Tools: Screwdriver, Electric drill, Regular drill bits (1/8”, 7/64”), Phillips screwdriver, Level, Measuring tape,
Pencil and Stepladder. Bear in mind that you will need at least two people to assemble the unit.