background image

© 2002-2006 DreamLine™. All Rights Reserved 

 

Victoria/DLG-65 

3

3.

 

Check on the drain if it is fastened tight enough to make sure it won’t leak after complete tray installation. 

4.

 

Check all the hose connections to prevent leakage. Your plumber may want to replace the flex hose to hard 

PVC pipes which is also possible.  

 

 

One of the ways on how to change flex hose to 

hard PVC pipes: 

Disconnect the flex hose from the shower drain 

unit. Fasten the 1 ½” hard PVC pipe to the drain. 

Using the trap adaptor with washer and plastic nut 

to fasten the PVC pipe to the adaptor from 1 ½” to 

2”.

 

III. Installation Process  

1.

 

Level the tray by checking and winding in or out the leveling legs behind the front skirting panel. To reach 

leveling legs, you should remove the front skirting panel. (Step 1, 2, 5). 

2.

 

Please, be careful not to break the inner supports for the tray – shown in Step 3, 4. 

3.

 

Clean the surface of the left back part of the tray and apply a layer of silicone (Step 6) 

4.

 

Place the left panel on the tray and fasten it with bolts (Step 7-10) 

5.

 

Next part to be attached is the decorative panel. Clean the side of the acrylic and apply a layer of silicone 

(Step 11) 

6.

 

Set the decorative panel in place and secure it with bolts (Step 12, 13) 

7.

 

Next part to be attached is the right panel. Apply a layer of silicone to the edge of the middle decorative 

panel and on the bottom of the tray where the acrylic part will be. (Step 14-16) 

8.

 

Fasten the acrylic wall using bolts (Step 17) 

9.

 

Next steps are the front glass assembly.  Using screws fasten the bottom guide rail to the left metal profile 

(left side when you see it from outside of the shower) (Step 18). 

10.

 

Insert stationary glass into the guide rail and the metal profile (Step 19). 

11.

 

With the help of a second person insert the second stationary glass in the guide rail and place the top guide 

rail on two stationary glasses. Secure the top guide rail on the left side with the metal profile (Steps 20-21). 

12.

 

Slide the doors in the guide rail slots (Step 22) 

13.

 

Fix the metal profile to the top and bottom guide rails with screws. Make sure the stationary glass fits into 

grooves in the metal profile (Step 23). 

14.

 

Insert white filler in the space between two stationary glasses on top and bottom guide rails (Step 24). 

15.

 

Fastening the posts. 

 There are two posts which should be attached to the front glass assembly. The left 

post has one groove only. Fit the post over the metal profile (Step 25).

 

16.

 

Secure the left post with the front glass assembly (Step 26-27).

 

17.

 

The right post has two grooves. Fit the post over the metal profile (Step 28).

 

18.

 

When the front glass assembly is completed with the posts, clean the surface of the left side of the acrylic 

wall, the front side of the tray, apply a layer of silicone and place the glass assembly (Step 29-32).

 

19.

 

Fix the left post to the acrylic wall making sure there is silicone in between the wall and the post (Step 33).

 

20.

 

Clean the surface of the acrylic wall and secure the side metal profile to the acrylic wall (Step 34-35).

 

Summary of Contents for Victoria

Page 1: ...ed and solid and will be able to support the total weight of the unit and its occupant You should also consult your local building codes on questions on installation compliance standards 3 Install all of the required plumbing and drainage before securing the shower Use a competent and licensed if required by local code plumber for all plumbing installation 4 Please insure that prior to the install...

Page 2: ...iding Glass Door 2 Pcs M6X20 bolts Nuts Washer 26 pcs Side Glass Parts 1 Set Left and Right posts 2 pcs Handle 1 Pair Connecting strips 2 pcs Foot Massager 1pc Top and bottom guide rails 2 pcs Handheld Showerhead 1pc ST4 2x16 Tapping Screw 24Pcs Tray pre installation instructions 1 Choose the place where you will locate the tray 2 Unwind the legs to level the tray in case the surface is uneven ...

Page 3: ...be Step 14 16 8 Fasten the acrylic wall using bolts Step 17 9 Next steps are the front glass assembly Using screws fasten the bottom guide rail to the left metal profile left side when you see it from outside of the shower Step 18 10 Insert stationary glass into the guide rail and the metal profile Step 19 11 With the help of a second person insert the second stationary glass in the guide rail and...

Page 4: ...onnection between the guide rail and the side metal profile Step 38 40 24 Fix the mirror with the screws and screw cover set Step 41 25 Secure the glass shampoo shelf on the acrylic back wall Step 42 26 Fasten the rubber door stoppers in places Step 43 44 27 Attach the handles 28 Place the roof and fasten it with bolts apply some silicone on the edges to seal the seams 29 Check the door alignment ...

Page 5: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 5 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12 Step 13 Step 14 Step 15 Step 16 Step 17 Step 18 Step 19 Step 20 Step 21 ...

Page 6: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 6 Step 22 Step 23 Step 24 Step 25 Step 26 Step 27 Step 28 Step 29 Step 30 Step 31 Step 32 Step 33 Step 34 Step 35 Step 36 ...

Page 7: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 7 Step 37 Step 38 Step 39 Step 40 Step 41 Step 42 Step 43 Step 44 Step 45 Step 46 Step 47 Step 48 Step 49 ...

Page 8: ... 2002 2006 DreamLine All Rights Reserved Victoria DLG 65 8 Step 50 Step 51 Step 52 ...

Reviews: