Murphy Ottoman Bed - Assembly guide - Page 12
11
Carefully lay frame down making sure
there is an even gap all round as in the
sketch.
Hol
d
frame securely then tighten all six bolt
sets 100% using spanner (h) &
a
llen key (d).
h
x1
d
x1
During this next step, the assistant should
hold up the slat frame. On side rails (C&D)
slide gas-lift piston stems (X) onto the axles
(Y ) then fit the flange lock-nuts (k).
SMALL GAP
h
k
(X)
(Y)
k
10
8
mm
h
x1
k
x2
Tighten nuts with spanner (h) - but do not over-tighten.
A small gap is needed so stems can move freely - this
is important - see sketch below.
C
D
&