background image

6

2

1

7

8

9

Headboard 

Footboard

Side Panel - Left 

Side Panel - Right 

Metal Slat Frame  
Angle Brackets

 2

Cross Bar 

Mattress Stoppers

1

10

2

11

Slat Frame Support Rail (wood)  

Base Boards

Base Board Support Rails (wood)  4

Ref.

Qty

Ref.

Description

5

SANA  STORAGE  BED

Parts Identification

Qty

1

2

3

1

1

1

Parts Checklist

Description

4

Page  1  of  8

5

1

2

6

9

7

160510

PLEASE  READ   this sheet prior to assembly to familiarise

yourself with the various stages of construction. Carefully 

open the pack supplied and check the contents against the 

parts and fittings check list. 

Do not destroy any of the packaging until you are certain 

that you have all the necessary parts for the assembly. 

Please ensure that the packaging is disposed of in 

a safe environmentally friendly way.
CAUTION:  There are small components used in the 

construction of this unit. These loose items should be 

 

d

i

o

v

a

 

o

,

y

l

b

m

e

s

s

a

 

g

n

ir

u

d

 

n

e

r

d

li

h

c

 

g

n

u

o

y

 

m

o

rf

 

y

a

w

 t

p

e

k

the danger of choking.

IMPORTANT: BEFORE STARTING TO ASSEMBLE THE BED - PLEASE READ THESE INSTRUCTIONS CAREFULLY. 

FABRIC 

HANDLE 

10

11

3

4

HEADBOARD END

FOOTBOARD END

8

Summary of Contents for SANA

Page 1: ...Carefully open the pack supplied and check the contents against the parts and fittings check list Do not destroy any of the packaging until you are certain that you have all the necessary parts for t...

Page 2: ...l Plates K to Metal Slat Frame 5 x2 K Cross head Screwdriver In the unlikely event of missing or damaged parts please contact the customer service team on 0344 292 00 00 When calling this number pleas...

Page 3: ...board locating the brackets behind the flat washers Fit the other two sets of bolts through the brackets into the central set of holes Tighten them all but loosely for now A B C 3 4 1 A B C 10mm 1 3 4...

Page 4: ...four corners are located tighten all the bolts using the Allen key D Stage 2 Page 4 of 8 Bed Assembly Use Pack A A x8 B x8 C x8 D x1 Stage 3 11 3 3 4 11 4 iv vi Fix the base board support rails 11 to...

Page 5: ...i f insertson top of the Slat frame 5 Using Allen key D tighten them 100 ii x3 E Fit base boards Use Pack A C x4 D x1 x4 J x2 K 2 5 5 Fitting Slat Frame Use Pack B Stage On the marked line in the cen...

Page 6: ...oles on slat frame with first set of holes in support bars nearest to headboard iv Using two bolt sets on each side F C B G loosely fix slat frame to the other four holes finger tight Fitting Slat Fra...

Page 7: ...the support bars The holes to use for cross bar are clearly labeled look carefully at the drawing Note that the cross bar must be fitted in this position otherwise the gas lift cylinders will be dama...

Page 8: ...ke a suitcase or a box must not touch the slats or they shall be damaged Maximum storage height is 185 mm 3 4 3 4 SMALL GAP I H X Y 3 H 8 Note Before fitting the mattress carefully move slat frame up...

Reviews: