background image

x 4

Nuts (M8) 

L

Lift up the slat frame by one person with two hands.

Another one assemble the gas lift with nuts.

Don't over tighten, a small gap is left so stem can 

move freely.

07

L

L

07

When

 fully a

ssem

bled a

nd th

e

mattre

ss is in

 positi

on,

pleas

e rais

e & lo

wer th

e

ottom

an 4-5

 time

s

To en

sure t

he ga

s pisti

ons a

re

fully lu

brica

ted

06

Wrap the handle strap to the frame as the diagram.

NOTE:

 When fully assembled and the mattress is

in position, please raise and lower the ottoman 4-5 times.

To ensure the gas pistons are fully lubricated.

Lift up the slat frame, use the locking nut (L) to fit the pistons to the lift mechanism. 

Note: A small gap is left so stem can move freely. This is normal, See the sketch.

SMALL GAP

x 1

Strap

A

Page 7 of 8

Bed Frame Assembly

10

9

Adjustable Foot

A

Summary of Contents for Yardley Double Ottoman

Page 1: ...result should be worth the effort 3 Do not discard any of the packaging until you have checked that you have all the parts and the pack of ttings 4 Assemble this product on a carpet 5 To ensure an eas...

Page 2: ...ers M8x20 x16 Nuts M8 x2 Leg 220x25x25 x2 Allen Key M8 x4 Screws 4x25 Black Soft Mat x4 Nuts Bolts M8x20 x8 x2 A B C D E F G H I J K L M N before assembly the bed please open the zipper at the back of...

Page 3: ...01 02 02 02 04 04 04 03 C C C C J 01 02 N N Loosely insert bolts C into each side of headboard 1 and foot board 2 Note Do not tighten fully but leave 10mm protruding Attach the side rails to the head...

Page 4: ...ling the feet Make sure the fabric is fixed evenly all around 05 K Turn the bed on its side and attach the fabric base to the bottom of the side rails headboard and footboard Note Make sure the fabric...

Page 5: ...x 2 Allen Key M8 J Page 5 of 8 Bed Frame Assembly 6 5 x2 Bolts M8x45 Nuts M8 x 2 E B Flat Washers M8x20 x 2 H 06 B J J H E 08 08 06...

Page 6: ...width E x 8 Nuts M8 x 8 Bolts M8x45 E x 16 Flat Washers M8x20 H I x 8 Bolts M8x45 x 2 Leg 220x25x25 E G Flat Washers M8x20 x 16 H I H H Nuts M8 x 8 I Put the slat frame on the lift mechanism use three...

Page 7: ...re the gas pistions are fully lubricated 06 Wrap the handle strap to the frame as the diagram NOTE When fully assembled and the mattress is in position please raise and lower the ottoman 4 5 times To...

Page 8: ...ing with a damp cloth Finally dry with a soft clean cloth Dust with a soft clean cloth only Check all bolts screws and legs regularly to make sure they haven t loosened and tighten all joins of your f...

Reviews: