SECTION 4
OPERATING
Page 48
OM515C520C99/1E
DRESSTA
LOADER TECHNIQUES
WARNING! Do not operate close to dangerous overhangs. Unskillful operation
of the loader may result in occurrence of overhangs that may slide on the
loader. Prevent occurrence of the overhangs or remove them using other
methods e.g. firing, digging from the top, etc.
Sequence of bank loading is shown in Fig. 4.53.
Fig. 4.53. Bank Loading
1. With the clam fully open, the multi-purpose bucket can be used as a bulldozer. Position the
bucket as shown in Fig. 4.54 for digging.
When the ground is hard or frozen and the area must be ripped before it can be worked, rip
a relatively small section and work it to grade before enlarging the cut. This will require ripping
each section only once, not every morning after the ground has refrozen. To prevent breaking or
bending scarifier teeth, never turn the loader while the scarifier teeth are in the ground.
Fig. 4.54. Bulldozing with Multi-purpose Bucket
Summary of Contents for 515C
Page 3: ...OM515C520C99 1E DRESSTA ...
Page 5: ......
Page 7: ......
Page 10: ...SECTION 1 INTRODUCTION ...
Page 12: ......
Page 17: ...SECTION 2 SAFETY PRECAUTIONS ...
Page 19: ......
Page 37: ...SECTION 3 MACHINE TRANSPORT AND STORAGE ...
Page 39: ......
Page 49: ...SECTION 4 OPERATING ...
Page 51: ......
Page 107: ...SECTION 5 MAINTENANCE ...
Page 165: ...SECTION 6 SPECIFICATIONS ...
Page 167: ......
Page 181: ...SECTION 6 SPECIFICATIONS Page 16 OM515C520C99 1E DRESSTA WIRING DIAGRAMS ...
Page 182: ...SPECIFICATIONS SECTION 6 Page 17 DRESSTA OM515C520C99 1E WIRING DIAGRAMS ...
Page 187: ...SECTION 6 SPECIFICATIONS Page 22 OM515C520C99 1E DRESSTA WIRING DIAGRAMS ...