49-109H F533
3
Dri-Eaz Products, Inc.
NOTICE:
Connect to two separate 15A circuits ONLY. A
bright green light on the front of the unit indicates correct
connections. No light will show when using only one cord
or if both power cords are plugged into the same power
circuit.
For best performance, use with two circuits and en-
sure green light is illuminated. If a second circuit is
not available, the unit may be operated on a single
power cord. Plug into Circuit 1. Note that the unit will
operate at 50% of the rated performance when using
a single power cord.
Startup display and normal display modes
When unit is first plugged in to AC power, the control
panel display will briefly cycle through a series of
readouts. This is par
t of the unit’s self-diagnosis proce-
dure and no user intervention is required.
Ducting Setup
NOTICE! For indoor use only. Do not expose the unit
to rain or snow. If electrical components become
wet, allow the unit to dry thoroughly before operat-
ing.
1. Reactivation Outlet Ducting
Use the duct clamp provided to attach the ducting to the
duct ring. The reactivation air should always be ducted
to the outside.
NOTICE: Temperatures inside React Out ducting can
reach 150°F (66°C). Use only heat-rated ducting as
provided.
Process Outlet Ducting
The process out air may be ducted where more focused
drying is required. Use with layflat ducting only.
Maximum Ducting Length
To ensure maximum performance, do not exceed these
ducting lengths:
Reactivation air
20 ft.
|
6 m
Process air
10 ft.
|
3 m
Inlet air
30 ft.
|
9.1 m
For more ducting options, see Fig. C.
NOTICE
Condensation may collect in the reactivation duct during opera-
tion. Do not allow water to run back into the unit. This could cause
a shock hazard or damage to the unit.
1. React outlet duct
ring. MUST BE IN-
STALLED
2. Process air in
duct (optional)
Fig. B: Initial Setup
1. Install 4 standoff
screws as shown.
Process air
outlet grille
2. Tuck layflat
ducting (pur-
chased sepa-
rately) through
square wire frame
and fold back out-
side the frame.
3. Place wire frame inside offset screws and
click into place. When not in use, frame may be
left in standoffs or placed in storage bin.
Square wire